BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Oklahoma City, Oklahoma. Contact the soliciting agency for additional information.

Last Updated: 2/22/2023 Last Updated: 2/22/2023 Oklahoma City Veterans Affairs Health Care System (OKC VA HCS) Work Statement (PWS) Medical Gas & Certification Service GENERAL: This project is for a contractor to provide medical gas and certification in accordance with NFPA 99, Health Care Facilities Code, current edition as well as the terms and conditions stated within this SOW annually for the Oklahoma City VA Health Care System, Oklahoma City, Oklahoma. The contractor is fully responsible for verifying and validating all information contained within this statement of work. Contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site. All measurements/quantities provided in this document are approximate and are to be used for reference only. The contractor will be responsible for taking on-site measurements and verifying all quantities and distances. All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified. The contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Oklahoma City VA HCS. VA facilities are tobacco free. No smoking is permitted on VA property. The contractor is responsible for their subcontractor s compliance with this policy. All work must conform to, and comply with, the latest edition/version of ALL applicable VA, federal, state, and local laws, rules, regulations, codes, and standards. BACKGROUND: This facility is approximately 1,000,000 square feet with 10 floors containing the equipment and outlets to be inspected and certified. All work will be performed within the facility. The medical gas system is comprised of: 1) 2 Master Alarm Panels Amico Medical Gas Alarms monitoring: Oxygen Primary Liquid Level Low Oxygen Secondary Liquid Low Head Pressure Oxygen Secondary Liquid Supply In Use Oxygen Secondary Liquid Low Head Pressure Oxygen Line Pressure High Oxygen Line Pressure Low In House Oxygen Emergency Reserve Cylinder in Use In House Oxygen Emergency Reserve Cylinder, Low Nitrous Oxide Reserve Cylinders in Use Nitrous Oxide Line Pressure High Nitrous Oxide Line Pressure Low Nitrogen Reserve Cylinders in Use Nitrogen Line Pressure High xiv. Nitrogen Line Pressure Low xv. Carbon Monoxide Level High Medical Air High Dew Point Medical Air Line Pressure High Medical Air Line Pressure Low Medical Air Compressor Required Medical Vacuum Low Medical Air Line Pressure Low Medical Air Compressor High Temp Shutdown Medical Air High Dew Point Medical Air Lag Compressor in Use Medical Air Line Pressure High Carbon Monoxide Level High Oxygen Manifold Western Enterprises, Model FHM2-9-12V Medical Air PowerEx, Model MSH05044KS 6 Medical Air Dryer PowerEx, Model PMD71000AJ - 2 Medical Air PowerEx, Model MSQ05055428364 4 Medical Air Dryer PowerEx, Model MDD050850 2 Nitrous Oxide Manifold Western Innovator, Model WMS-13-37 Nitrogen Manifold Amico Corporation Oxygen Outlets 577 Medical Air Outlets 425 Medical Vacuum Outlets 630 Nitrous Oxide Outlets 36 Nitrogen Outlets 50 Waste Anesthetic Gases - 15 STATEMENT OF WORK: The contractor shall provide supervision, manpower, and materials to conduct a medical gas and certification in accordance with NFPA 99, Health Care Facilities Code. Contractor shall ensure each requirement listed in this PWS is satisfied and that constraints are honored and respected. If the contractor has any conflicts or challenges with these, they should consult the COR or CO. Contractor shall furnish all contract oversight, management, technically trained personnel, labor, equipment, tools, materials, supplies, insurances, and transportations necessary to provide scheduled Medical Gas and Certification If the contractor detects that any Government equipment or component being inspected under the contract is in need of reconditioning, repair, replacement (or disposal), details shall be submitted in writing to the COR. The Contractor shall not undertake or perform any reconditioning, repair, or replacement of equipment without prior authorization from the COR. The contractor shall provide the COR a copy of NITC Medical Gas Verifier 6030 licenses, required for person/people performing the in this SOW prior to the conducting inspections. Either a paper or electronic version which may be emailed must be provided within: 15 business of contract and 15 business after any contract option year awards The inspector shall carry the license with him/her during the entire duration of the . The Contractor must provide the COR with certification attesting that all gauging and measurement equipment used to check and calibrate the subject items of equipment has been calibrated either according to the manufacturer s specifications or within the last twelve months against a standard that is traceable to the National Bureau of Standards. Such certification shall be provided with the service report submitted. The contractor shall provide the COR written confirmation that the Contractor has adequate insurance protection against negligent work and other forms of liability. The nature and level of protection must be acceptable to this VA. Either a paper version or emailed version must be provided to the COR within: 15 business of contract and 15 business after any contract option year awards The contractor shall immediately report to the COR on all safety or operational related deficiencies during the . The Contractor shall provide the COR with a Service Report detailing all tests performed, all findings, and all recommendations. The Service Report is to be signed and dated by designated Contractor POC and given to the COR within two weeks of performing the Service. The Service Report is to be submitted by to the COR in addition to a printed copy. Contractor shall provide a statement describing their policy for charging of any additional fees due to rescheduling if equipment is not at the time of the approved scheduled service call. Contractor shall contact the COR upon completion of IMPORTANT NOTE: This Sources is for information only (to determine the socioeconomic status of interested companies). No will be made off of this posting. LIMITATIONS OF SUBCONTRACTING: The Limitations of Subcontracting may or may not apply to a resulting solicitation from this Market Research. Vendors are advised to familiarize themselves with Federal Acquisition Regulation parts 19.505(a)(2) and 19.505(b)(1) as it pertains to subcontracting limitations. Vendors are also advised to familiarize themselves with 13 CFR 125.6 and the penalties described in this regulation. Please communicate via e-mail to tiffani.perkins@va.gov by COB 10/19/2023 as to your company s interest and ability to perform service per this brief Scope of Work. If interested, please provide the following: Please state your company s business size as related to NAICS code 541350 As per the Limitations of Subcontracting: (see FAR 19.505) As Primary Contractor: what % of Total Contract will you retain. If using a Subcontractor: what % of Total Contract will go to them. Please provide SAMs Unique Entity Identifier number If you have an FSS/GSA contract that includes this service Provide FSS/GSA contract number if applicable A In order for you company s information to be counted in relation to this Market Research all above questions must be answered.

Conceptual

Medical

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
426
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2024

img_map_placeholder

921 NE 13th St, Oklahoma City, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.