BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Construction of Water Plant No. 2 Rehabilitation Phase 1 for Fallbrook UD, Harris County, Texas The rehabilitation for the existing water plant encompasses a range of activities, including but not limited to: cleansing, power washing, abrasive blasting, and recoating the inner and outer surfaces of a one (1) 400,000-gallon Ground Storage Tank (GST), as well as two (2) 20,000-gallon Hydropneumatic Tanks (HPTs); installation of flexible waterproof mast between GST chime and foundation; sealing the HPT tank bases to concrete pedestals; applying a non-skid coating to the GST's roof, extending handrails; installation of a new internal ladder with a SAF-T climb safety rail to the GST; and installation twelve equally spaced peripheral shell vents for the GST. The rehabilitation also involves solvent cleaning followed by manual or power tool cleaning of aboveground piping and the well motor, abrasive blasting, cleaning, and recoating of booster pumps, associated piping, hatches, valves, and related components. The rehabilitation encompasses the appropriate disposal of the existing concrete board fence and installation of 8-foot wooden fence, with a three-strand barbed wire and rot board. Installation of aboveground and underground water pipes to facilitate the conveyance of surface water from the future meter station, installation of surface water inflow piping to the GST, installation of yard piping for future chemical injection of chlorine, LAS and orthophosphate, installation of yard piping to bring sample from meter run to future analyzer, installation of yard piping for future analyzer drain. The deadline to ask questions is 10/25/2023 10:00 AM CST A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids.

Bid Results

Water / Sewer

$589,000.00

Public - County

Site Work

18

25

2

6

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
7
Bidding Soon
2,470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2023

November 27, 2023

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.