BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2023 at 7:00 PM

Updated May 6, 2025

Site work for a bridge / tunnel in Reno, Ohio. Completed plans call for site work for a bridge / tunnel.

County: Washington Dbe Goal: 3.50 Culvert Replacement C/r/s: Was-sr 26-19.32 Completion Date: 9/15/2024 For Improving Various Sections in Ludlow and Grandview Townships, in Washington County, of the State of Ohio, in Accordance With Plans and Specifications by Replacing Three Existing Corrugated Metal Pipes on Sr-26 With a Reinforced Concrete Circular Pipe and One Existing Corrugated Metal Pipe on Sr-260 With Either Reinforced Concrete, Precast Concrete, Corrugated Steel, or Aluminum Pipe. The Project Also Includes Minor Paving Work and Guardrail Replacement, as Well as Other Related Work. OH DOT - Culvert Replacement - SR 26

Award

Bridges / Tunnels

$682,206.00

Public - State/Provincial

Site Work

39

5

2

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
40
Bidding Soon
985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

January 15, 2024

Project location map

OH-26, Reno, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.