BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2023 at 7:00 PM

Updated January 27, 2024

Demolition, site work, new construction, remodeling and addition to a mixed-use development in Canton, Michigan. Completed plans call for the addition of a stadium; for the demolition of a stadium; for the construction of a stadium; for the remodel of a stadium; for site work for a stadium; educational facility; educational facility; educational facility; educational facility; and educational facility.

Sealed Bids for the Plymouth Canton Community Schools, Bid Package HS-4 and P-CEP 1 consisting of: This Bid Package will consist of separate sealed Bids for the following Bid Divisions: 101: Sitework/Underground Utilities 102: Asphalt Paving and Exterior Concrete 103: Selective Demolition 104: Concrete Footings & Foundations 105: Interior Concrete Flat Work 106: Masonry 107: Steel 108: Carpentry / General Trades 109: Roofing / Sheetmetal 114: Aluminum Entrances / Storefront / Glass & Glazing 115: Metal Stud / Drywall 116: Hard Tile 117: Acoustical Treatments 118: Carpet / Resilient Tile Flooring 120: Painting 124: Wood Flooring 125: Toilet Partitions 131: Athletic Equipment 136: Telescoping Bleachers 137: Food Service Equipment 140: Plumbing 141: Fire Suppression 142: HVAC 143: Electrical 149: Fencing 156: Exterior Grandstands 166: Synthetic Turf 167: Track Surfacing All Bids must include the following sworn and notarized statements: - Familial Disclosure Affidavit (Section 004205) - Iran Linked Business Affidavit (Section 004210) - Criminal Background Check Affidavit (Section 004220) The Board of Education will not accept a Bid that does not include these sworn and notarized disclosure statements. For official project details and updates including complete project documents, please contact the construction manager directly. Please see the invitation to bid for more details. If awarded a Contract, the successful Bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the Contract price. Although a firm timeline for construction has not been determined, construction is not expected to commence until early 2024.

Post-Bid

Educational

$1,360,000.00

Public - County

Addition, Demolition, New Construction, Remodeling, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
195
Bidding Soon
2,572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2023

March 18, 2024

Project location map

8415 N Canton Center Rd, Canton, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.