Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Etowah, Arkansas. Completed plans call for the renovation of a water / sewer project.
The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, Forms of Bid Bond, Performance and Payment Bond, and other Contract Documents may be examined at the following locations In accordance with Act 150 of 1965, as amended, all bidders shall conform to the requirements of the Arkansas State Licensing Law for Contractors. An Arkansas Contractor's license is not required at the time of the bid submission. However, one is required at the time that the contract is signed. Contractor shall remove the existing generator at the wastewater treatment facility. This generator shall remain the property of Etowah and be delivered to Etowah for storage. The contractor shall provide and install a new generator. The contractor shall connect the generator to the existing gas supply lines and existing automatic transfer switch. It is intended that the contract shall include all materials, labor, equipment, services, etc. required for the Contract 1 - Replacement of grinder pumps, and Contract 2 - Replacement of generator at the wastewater treatment facility in Etowah, Arkansas, together with any site work and attendant facilities thereto, as shown in the Drawings and described in the Specifications prepared by Miller-Newell Engineers, Inc., 510 Third Street, Newport, AR. The Contractor will not be required to perform work that is not within the general character and scope of the Drawings and Specifications or not reasonably inferrable therefrom; however, he must recognize and accept the fact that these documents are not intended to illustrate or describe each and every possible detail of construction or finish that will be encountered in the execution of the work, nor can they show the exact location of each mechanical line, wiring device, fixture, etc. Where conditions are encountered that have not been specifically shown or detailed, they shall be worked out and finished similar to other details of like nature, or in accordance with supplementary Drawings furnished by the Engineer. It shall be the responsibility of the General Contractor to coordinate all of the various phases of the construction and finish materials, including mechanical and electrical lines and equipment, so that all of the many components will fit together and function properly without interference one to the other to the end that the entire job when completed will present a neat and finished appearance with all movable parts and mechanical and electrical equipment operating properly, ready for the Owner's use. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Miller-Newell Engineers, Inc. P.O. Box 705 Newport, AR 72112 FAX: 870-523-6533 Email: milnewengr@aol.com
Bid Results
Water / Sewer
$972,950.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2023
December 4, 2023
To Be Determined, Etowah, AR
Related To This Project
Etowah, AR
Bid Date: Nov 02 2023
Etowah, AR
Bid Date: Nov 02 2023
Etowah, AR
Bid Date: Jan 11 2023
Etowah, AR
Bid Date: Nov 02 2023
Conway, AR
Bid Date: Nov 16 2023
Mountain View, AR
Bid Date: Oct 23 2023
Little Rock, AR
Bid Date: Oct 25 2023
Little Rock, AR
Bid Date: Oct 12 2023
Searcy, AR
Bid Date: Jan 17 2024
Arkadelphia, AR
Bid Date: Oct 24 2023
Bentonville, AR
--
Wilson Junction, AR
Bid Date: Nov 01 2023
Rector, AR
Bid Date: Nov 01 2023
North Little Rock, AR
Bid Date: Oct 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.