Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work and paving for a civil project in San Clemente, California. Completed plans call for site work for a water / sewer project.
As of October 23, 2025, construction is underway. The work to be performed, includes installation of approximately 221 linear feet of 42-inch HDPE pipe; approximately 172 linear feet of 28-inch HDPE pipe; construction of six (6) catch basins (and connectors); construction of 1,100 linear feet of PVC sewer force main with two connections to the existing 6-inch AC force main; construction of a new sewer 48-inch diameter manhole on an existing 8-inch VCP gravity sewer; construction of approximately 50-feet of 8-inch PVC gravity sewer 2 feet under an existing 8-inch VCP gravity sewer and maintaining sewer flows; construction of approximately 240 linear feet of 4-inch conduit with pull rope and pull boxes from an existing SDG&E pull box to a new transformer pad to replace the existing pad adjacent to the existing lift station electrical room; construction of approximately 140 feet of 2-inch Cox communication conduit with pull rope and pull boxes from the existing pull box adjacent to the existing lift station wet well to the existing lift station electrical room; construction of six (6) 2-inch conduits and pull boxes from the existing pull box adjacent to the existing lift station wet well to the existing lift station electrical room with power, grounding and communication wires; the reconstruction of storm drain ocean outlet; and construction of nine (9) 30-inch diameter concrete caissons (50-feet deep each), grading; construction of curb and gutter and asphalt paving improvements, all as described in the attached specifications and plans. The general method of the storm drain, sewer forcemain and gravity sewer construction work includes limited removal and replacement of existing A.C. pavement and Portland cement concrete curb & gutters, sidewalks, erosion control BMPs, construction of new concrete junction structures, construction of catch basins and protection (in place) of existing utilities. The work also includes traffic control. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% License Requirements Class A. Start/Delivery Date 1/2024 Project Duration 120 Working Days
Under Construction
Water / Sewer
$2,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 10, 2024
October 7, 2024
Calle Ariana & Avenida De Las Palmera, San Clemente, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.