BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Killeen, Texas. Conceptual plans call for the renovation of a military facility.

The U.S. Army Corps of Engineers - Fort Worth District has been tasked to solicit for and a --Build Construction contract Bldg. 410 Renovations (Phase 1) on Fort Cavazos. The proposed project will be a competitive, firm-fixed price procurement. The acquisition strategy decision will be based on the respondent's capabilities from this and/or other market research methods. See Attachment for sources details. This project is Phase 1 of the renovation of Building 410 to improve the heating and cooling, add improved fire protection and address life safety issues. Building 410 is the First Army Division West Headquarters and provides administrative facilities for unit personnel functions. The 124,817 square foot three level building consists of offices, conference rooms, classrooms, weapon vaults, fitness area, showers and supporting function mechanical, electrical, and communication rooms. Building 410 is made up of four independent building quadrants with a central courtyard. Upgrade of the building HVAC system to include replacement of building chillers and boilers and replacement of external cooling tower. Upgrade 3rd floor HVAC to include upgrade of HVAC systems, routing of new ductwork, hydronic piping in overheads, and expansion of specific mechanical rooms. Install new fire suppression system capable of supporting the whole building including a new fire riser system, sprinklers will only be installed on the third floor. Other work to include incidental work on the third floor only such as new acoustic ceilings and lighting plan, upgrade of specific doors and door hardware to STC 50 rating. The third floor will not be occupied during construction, but the remainder of the building will be occupied and systems must remain operational. The of construction for this project is estimated between $5,000,000 and $10,000,000. Estimated duration of the project is 480 calendar . The Method of Contractor Selection has not been determined at this Time *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$10,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
82
Bidding Soon
2,280
All Active Projects
855
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 7, 2024

March 2, 2026

img_map_placeholder

To Be Determined, Killeen, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.