BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 14, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a service station / car wash facility in Sacramento, California. Completed plans call for site work for a service station / car wash facility.

This solicitation will provide up to $20 million to support Medium- and Heavy- Duty infrastructure along designated corridors for both electric and fuel cell electric vehicles. Designated corridors were provided through the efforts of the Clean Transportation Commission mandated by Senate Bill 671. Contact Information Brad Worster, Commission Agreement Officer California Energy Commission 715 P Street, MS-1 Sacramento, California 95814 Telephone: (916) 897-1647 E-mail: brad.worster@energy.ca.gov Deadline for Written Questions by 5:00 p.m.* October 13, 2023 Anticipated Distribution of Questions/Answers :November 7, 2023 Support for Application Submission in the Energy Commission Agreement Management System (ECAMS) until 5:00 p.m. Ongoing until November 17, 2023 Anticipated Notice of Proposed Awards Posting :Week of February 5, 2023 Anticipated CEC Business Meeting : May 2024 Solicitation objectives include: Supporting MDHD ZEV hydrogen refueling or charging stations along designated corridors to build out infrastructure for the MDHD ZEV goals set forth in EO N-79-20, the Advanced Clean Trucks (ACT)[ California Air Resources Board Advanced Clean Trucks.and Advanced Clean Fleet (ACF)[ California Air Resources Board Advanced Clean Fleets. regulations, and other applicable statewide goals and regulations. Supporting a coordinated strategy with other agencies for the MDHD ZEV infrastructure build-out statewide Zoom is the CEC's online meeting service. When attending remotely, presentations will appear on your computer/laptop/mobile device screen, and audio may be heard via the device or telephone. Please be aware that the Zoom meeting will be recorded. Zoom Instructions: To join this workshop, go to Zoom at: https://energy.zoom.us/j/84449909034 pwd=LzlMdDR4WUdUR3VWd2FidVJjSXVnQT09. You may also access the workshop by going to the Zoom webpage at https://join.zoom.us and enter the unique meeting ID and password below: Meeting ID: 844 4990 9034 Meeting Password: 047590 Topic: Pre-Application Workshop for GFO-23-602: Charging and Refueling Infrastructure for Transport in California Provided Along Targeted Highway Segments (CRITICAL PATHS) Telephone Access Only: Call (888) 853-5257 or (888) 475-4499 (toll-free). When prompted, enter the unique meeting ID number above. To comment over the telephone, dial *9 to "raise your hand and *6 to mute/unmute your phone line. Access by Mobile Device: Download the application from the Zoom Download Center, https://energy.zoom.us/download During the solicitation process, for questions only related to submission of applications in ECAMS, please contact ECAMS.SalesforceSupport@energy.ca.gov. By contacting this email address, Applicants will be able to access a team of technical assistants who can answer questions about application submission. Please also see Section III for additional information about ECAMS. Applicants may ask questions at the Pre-Application Workshop, and may submit written questions via e-mail to the CAO listed in the following section. However, all technical questions must be received by the deadline listed in the Key Activities and Dates table above. Questions received after the deadline may be answered at the CECs discretion. Non-technical questions (e.g., questions concerning application format requirements or attachment instructions) may be submitted to the CAO at any time prior to 5:00 p.m. of the application deadline date. Similarly, questions related to submission of applications in ECAMS may be submitted to ECAMS.SalesforceSupport@energy.ca.gov at any time prior to 5:00 p.m. of the application deadline date. Minimum and maximum award amounts are described below: o Minimum award: $5 million per project o Maximum award: $20 million per project

Post-Bid

Service Station / Car Wash

$20,000,000.00

Public - State/Provincial

Site Work

6

9

8

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
32
Bidding Soon
3,010
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2023

January 29, 2024

Project location map

To Be Determined, Sacramento, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.