Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a service station / car wash facility in Sacramento, California. Completed plans call for site work for a service station / car wash facility.
This solicitation will provide up to $20 million to support Medium- and Heavy- Duty infrastructure along designated corridors for both electric and fuel cell electric vehicles. Designated corridors were provided through the efforts of the Clean Transportation Commission mandated by Senate Bill 671. Contact Information Brad Worster, Commission Agreement Officer California Energy Commission 715 P Street, MS-1 Sacramento, California 95814 Telephone: (916) 897-1647 E-mail: brad.worster@energy.ca.gov Deadline for Written Questions by 5:00 p.m.* October 13, 2023 Anticipated Distribution of Questions/Answers :November 7, 2023 Support for Application Submission in the Energy Commission Agreement Management System (ECAMS) until 5:00 p.m. Ongoing until November 17, 2023 Anticipated Notice of Proposed Awards Posting :Week of February 5, 2023 Anticipated CEC Business Meeting : May 2024 Solicitation objectives include: Supporting MDHD ZEV hydrogen refueling or charging stations along designated corridors to build out infrastructure for the MDHD ZEV goals set forth in EO N-79-20, the Advanced Clean Trucks (ACT)[ California Air Resources Board Advanced Clean Trucks.and Advanced Clean Fleet (ACF)[ California Air Resources Board Advanced Clean Fleets. regulations, and other applicable statewide goals and regulations. Supporting a coordinated strategy with other agencies for the MDHD ZEV infrastructure build-out statewide Zoom is the CEC's online meeting service. When attending remotely, presentations will appear on your computer/laptop/mobile device screen, and audio may be heard via the device or telephone. Please be aware that the Zoom meeting will be recorded. Zoom Instructions: To join this workshop, go to Zoom at: https://energy.zoom.us/j/84449909034 pwd=LzlMdDR4WUdUR3VWd2FidVJjSXVnQT09. You may also access the workshop by going to the Zoom webpage at https://join.zoom.us and enter the unique meeting ID and password below: Meeting ID: 844 4990 9034 Meeting Password: 047590 Topic: Pre-Application Workshop for GFO-23-602: Charging and Refueling Infrastructure for Transport in California Provided Along Targeted Highway Segments (CRITICAL PATHS) Telephone Access Only: Call (888) 853-5257 or (888) 475-4499 (toll-free). When prompted, enter the unique meeting ID number above. To comment over the telephone, dial *9 to "raise your hand and *6 to mute/unmute your phone line. Access by Mobile Device: Download the application from the Zoom Download Center, https://energy.zoom.us/download During the solicitation process, for questions only related to submission of applications in ECAMS, please contact ECAMS.SalesforceSupport@energy.ca.gov. By contacting this email address, Applicants will be able to access a team of technical assistants who can answer questions about application submission. Please also see Section III for additional information about ECAMS. Applicants may ask questions at the Pre-Application Workshop, and may submit written questions via e-mail to the CAO listed in the following section. However, all technical questions must be received by the deadline listed in the Key Activities and Dates table above. Questions received after the deadline may be answered at the CECs discretion. Non-technical questions (e.g., questions concerning application format requirements or attachment instructions) may be submitted to the CAO at any time prior to 5:00 p.m. of the application deadline date. Similarly, questions related to submission of applications in ECAMS may be submitted to ECAMS.SalesforceSupport@energy.ca.gov at any time prior to 5:00 p.m. of the application deadline date. Minimum and maximum award amounts are described below: o Minimum award: $5 million per project o Maximum award: $20 million per project
Post-Bid
Service Station / Car Wash
$20,000,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2023
January 29, 2024
To Be Determined, Sacramento, CA
Related To This Project
Sacramento, CA
--
Sacramento, CA
Bid Date: Oct 31 2023
Sacramento, CA
Bid Date: Oct 30 2023
Sacramento, CA
Bid Date: Nov 09 2023
Sacramento, CA
Bid Date: Nov 09 2023
Sacramento, CA
Bid Date: Jan 04 2024
Sacramento, CA
Bid Date: Nov 09 2023
Sacramento, CA
--
Sacramento, CA
Bid Date: Nov 09 2023
Sacramento, CA
Bid Date: Oct 25 2023
Sacramento, CA
Bid Date: Dec 15 2023
Sacramento, CA
Bid Date: Nov 17 2023
Sacramento, CA
Bid Date: Oct 23 2023
Sacramento, CA
Bid Date: Nov 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.