BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2023 at 8:00 PM

Updated January 29, 2024

Site work for a power facility in Las Vegas, Nevada. Completed plans call for site work for a power facility.

The 2.3 MW solar facility will be delivered through the design-build methodology. This facility will be located adjacent to the existing Phase I facility. The design and construction of the Phase II facility is made possible by a grant from the Economic Development Administration (EDA), an agency of the U.S. Department of Commerce.

Post-Bid

Power Plant

$4,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
23
Bidding Soon
374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

August 26, 2024

Project location map

To Be Determined, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.