Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 15, 2023 at 7:00 PM
Updated January 27, 2024
Renovation of a mixed-use development in Orlando, Florida. Completed plans call for the renovation of a educational facility.
Scope of work includes MEP & architectural demolition work, Ceiling systems removal and replacements as required to support new multi-system work. Miscellaneous door, frame, hardware, and louver replacement work, miscellaneous exterior masonry repairs, exterior sealants, painting. Interior floor coatings in mechanical rooms, drywall repairs, ceiling repairs, painting, and flooring at new architectural work. The construction of a new Sally Port at the Campus entrance includes casework, new security fencing, masonry walls, and bulletproof window film. The removal of existing chillers, and replacement of existing chillers with new air-cooled chillers and pumps associated CW piping, pipe insulation, associated valves, gauges, and sensors. Mechanical demolition and replacement work including the removal and replacement of existing AHUs, VFDs, exhaust fans, VAVs, other identified and associated mechanical equipment work, CW piping, pipe insulation, associated valves, gauges, and sensors, ductwork and duct insulation, and balancing dampers campus wide. New mechanical controls system, and the connection of the BAS system to all mechanical equipment, and new monitor stats for mini split systems for MDF and IDF rooms. Electrical demolition and replacement work including new switch gear, electrical equipment, surge protectors, raceways, conductors, grounding, surge suppression, and other identified electrical work required to support the new mechanical & LV system equipment replacements. Lightning Protection System replacement work and re-certification of the system. Removal of existing Fire Alarm system with new addressable Fire Alarm System. New Fire Alarm System to include panels, devices, new raceways, and cabling/wiring interconnections to Mechanical equipment and building egress requirements. Removal of the existing intercom system. Access control system work including card readers and alarms, Intrusion detection including motion devices and cameras with infrastructure to support it along with the replacement of current malfunctioning cameras. LV device positioning and adjustments to meet ADA requirements. MWBE, LBD and VBE trade contractors and suppliers are encouraged to participate.
Post-Bid
Educational
$10,000,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2023
December 13, 2023
3130 Edgewater Dr, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Nov 22 2023
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: Nov 14 2023
Orlando, FL
Bid Date: Nov 13 2023
Orlando, FL
Bid Date: Nov 21 2023
Orlando, FL
Bid Date: Nov 21 2023
Orlando, FL
--
Orlando, FL
Bid Date: Dec 28 2020
Orlando, FL
Bid Date: Nov 28 2023
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: Dec 07 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
