Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 16, 2023 at 8:00 PM
Updated January 27, 2024
Site work for a water / sewer project in Castle Hayne, North Carolina. Conceptual plans call for site work for a water / sewer project.
In 2014 the Airport Authority designed and constructed 4,000 feet of 12- inch water main for the purpose of increasing fire protection at airport facilities near Blue Clay Road. Because there was no demand on the main, it was permitted as a private main and separated from the potable distribution system by a backflow preventer. At that time, it was acknowledged that at such time that adequate potable demand could be added to the main, it would be conveyed to CFPUA for ownership and operation as part of the overall distribution system. The Northern Pump Stations and Force Main (Phase B) capital project is constructing a 24-inch sewer force main along the same route that this water main would follow to interconnect at Kerr Avenue. If both the force main and the water main are constructed at the same time, the construction will be more efficient, and the overall cost will be less. This project will significantly increase fire protection throughout ILM and increase water availability and capacity as far north as Holly Shelter Road. The project is include in the city's 2024-2033 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$1,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2025
Blue Clay Rd, Castle Hayne, NC
Related To This Project
Castle Hayne, NC
--
Castle Hayne, NC
Bid Date: Mar 27 2024
Castle Hayne, NC
Bid Date: Jun 25 2024
Castle Hayne, NC
--
Castle Hayne, NC
--
Castle Hayne, NC
Bid Date: Jul 30 2020
Castle Hayne, NC
--
Castle Hayne, NC
Bid Date: Dec 20 2024
Castle Hayne, NC
Bid Date: Oct 10 2023
Castle Hayne, NC
Bid Date: Oct 11 2023
Castle Hayne, NC
Bid Date: Sep 14 2022
Castle Hayne, NC
--
Castle Hayne, NC
Bid Date: Mar 09 2022
Castle Hayne, NC
--
Castle Hayne, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
