BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2024 at 7:00 PM

Updated February 8, 2024

Demolition, site work and new construction of a water / sewer project in Houston, Texas. Completed plans call for the demolition of a water / sewer project; for site work for a water / sewer project; and for the construction of a water / sewer project.

Replacement and removal of the existing motor control center and construction of a new motor control center building including miscellaneous electrical work on the water plant site. A Bid must be accompanied by Bid security made payable to Owner in an amount of two percent of Bidders maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions.

Bid Results

Water / Sewer

$754,269.00

Public - County

Demolition, New Construction, Site Work

23

17

15

6

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
417
Active Projects
227
Bidding Soon
3,351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.