BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Questions Due Date: Oct 13th 2023, 11:30 AM CDT Various Trades PLA for work over 25K Provide Labor and Materials: Relocate Furniture, Remove Existing Flooring, Apply Skim Coat, Install commercial grade 12x12 VCT, and Reinstall Furniture in its Original Location for approximately 2,250 sq. ft. which includes the Front Reception Area, Main Office, and Conjoining Offices during Christmas Break 1) Uninstall and Relocate Office Furniture to Designated Location 2) Remove Existing Flooring, Sub-Flooring, Quarter-Rounds, and Thresholds 3) Furnish and install Skim Coat 4) Furnish and install commercial grade 12x12 VCT 5) Strip and rewax floor with at least three coats of wax applied after install. 6) Install Quarter-Rounds 7) Install and Replace Furniture in its Original Location 8) Contractor to secure necessary permits. 9) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 10) Not responsible for contractor errors as a result of non-field verification. 11) Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 09 30 00 TILING 12) Secure job site overnight if work is not completed in one day. 13) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 14) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 15) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 16) Contractor is to remove and dispose of materials torn out and any construction debris. 17) All trash must be removed off-site by contractor. 18) Clean the surrounding area and make sure all is swept of debris. 19) All questions/requests must be received two (2) business days prior to bid closing.

Bid Results

Educational

$62,498.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
124
Bidding Soon
1,836
All Active Projects
822
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

img_map_placeholder

11220 S Wallace St, Chicago, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.