BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and renovation of a mixed-use development in Coatesville, Pennsylvania. Completed plans call for the construction of a medical facility; for the demolition of a medical facility; for the renovation of a medical facility; and for site work for a medical facility.

IV Cleanroom RFI Amendment #1 010000 paragraph 1.11.D Is this requirement applicable to this project  If it is, are we using the definition in 013323 paragraph 1.2.B for shop drawings Yes to both questions. 010000 paragraph 1.12 Is a warranty management plan submittal necessary in addition to the warranties provided in a closeout binder at the end of the project Yes 010000 paragraphs 1.22 & 1.23 Will all general contractors be held to these very specific photographic documentation specifications Yes, as applicable to all work areas and disciplines utilized in the accomplishment of this project. 013323 paragraph 1.3.C Can a submittal register be provided for this project prior to the bid date Yes. 013323 paragraph 1.8.A Some specifications very clearly denote when O&M documents are required, and others do not. Do all specification sections require O&M documentation Yes, All specification sections will need a designated set of O&M documentation 013526 paragraph 1.7.C Can the SSHO for the general contractor also be the superintendent  No. 013526 paragraph 1.8.B Is the SSHO considered a CP and required to have OSHA 30 training within the past 5 years Yes. 013526 paragraph 1.8.D Is there a 5-year expiration for OSHA 10 cards No. Per OSHA - OSHA 10 Cards do not expire. However, It is the GC's responsibility to ensure all other workers on site are competent and knowledgeable of OSHA 10 Requirements. 014500 paragraph 1.3.A.2 & 3 Are these submittals required Yes. 015719 paragraph 1.4.A.1 Will all general contractors be held to the standards of this Environmental Protection Plan specification Yes. 017419 paragraph 1.5.B Will all general contractors be held to the standards of this Demolition Debris Management Plan Yes. 079200 paragraph 1.4.E Are cured samples applicable Yes. 092900 paragraph 1.4.D Are samples applicable Yes. 099100 paragraph 1.3.D Are sample panels applicable Yes. 260511 paragraph 1.12.F Does division 26 require a separately submitted closeout binder, or can it be part of the entire closeout binder for the whole project Yes, Maintenance and operations Manuals require their own binder. Regarding all Commissioning, Specification Sections 01.91.00 and 07.08.00, please confirm, the VA will engage the Commissioning Agent under a separate contract. The construction contractor shall provide an independent commissioning agent as part of the contract. Are the wood doors rotary cut red oak All of the corridor doors in the older buildings are red oak. Offerors should bid the project with this material for wood doors. For hollow metal door 211Y, what is the size of the terminated stops 6" What type of electric lock is being used on the wood doors Electric strike What type of lite kit does the metal door get Half Lite Any off-shift requirements for this Project Yes. While normal working hours is the intent, the contractor should anticipate the possibility of work required off-shift. These off-shift activities hours shall be indicated in the construction schedule by the contractor and approved by the COR. Any unscheduled or unforeseen construction activities requiring off-shift work shall be requested at least two weeks in advance of the off-shift requirement and approved by the COR prior to commencing work. Off-shift work may include, but not be limited to, safety or comfort of building occupants during any construction activity (examples: demolition work or deliveries of large equipment/materials or placing large equipment/material in-place or hauling or cutting/patching or welding or drilling) which is deemed unsafe or excessively loud or any other construction activity (inside or outside) that disrupts on-going building operations deemed inappropriate by the COR and/or the contractor. The contractor shall track all off-shift hours separately and report these to the COR on a weekly basis. Any unforeseen or unscheduled construction activity requiring off-shift work shall not be considered a delay to the contractor caused by the government and no claims will be consider for any additional off-shift work that may be required.  Is the cleanroom ceiling to be panelized vs. a drop grid If yes, then does it need to be walkable for access to terminal filters and lights In either case, what is the height of the structure to suspend the ceiling from And from the drawings I believe the cleanroom ceiling is to be 9' AFF - please  confirm In the case of a walkable ceiling, is there access to the top of the ceiling after construction from elsewhere, or do we need to provide access panels in the ceiling, to enter through the cleanroom a. The cleanroom ceiling surrounding the Ante Room - ISO CLASS 8 211 and IV ROOM - ISO CLASS 7 210 rooms is specified to be a gasketed drop grid. b. Height to existing structure above is 11'-8 1/8"". 8'-0"" APC-1 ceilings specified on A112 D6 of the Construction Documents. c. Not a walkable ceiling surrounding the Ante Room - ISO CLASS 8 211 and IV ROOM - ISO CLASS 7 210 . The spec calls out Portafab 300 Series, which is anodized aluminum studs and that is what the pics of the existing room shows. However, it is available in white powder-coated - which makes it all white - advise if we should include. All white is acceptable. Please provide the Acoustical Ceiling Specifications. See Attached. Please confirm the Building and Room to where the Bids shall be delivered. Bids should be mailed/delivered to Coatesville VAMC, Building 70. The bid opening will take place at 10:00 AM in the conference room of Building 70. Can you confirm that this is a hard bid We ve been conditioned by bidding mostly in Altoona, Pittsburgh, Lebanon and NY that most bids are delivered via email, so I wanted to verify. This will be a hard bid. Bids should be delivered in person or mailed to the address in block 8 on page 1 of the contract by 10:00 AM on 1/3/2024. Bids received after this time will not be accepted. Are there any special directions concerning what you d like submitted with the bid documents  For instance, should the price be put in box 17 on the SF1442 or should it be placed in the Price/Cost Schedule on page 6 of the solicitation  Should all 74 pages of the solicitation be submitted, or should we stick to the SF1442, perhaps the Price/Cost Schedule and the necessary VAAR and FAR Regulations that require signature  Page 19 indicates that FAR 52.204-7 is incorporated so paragraph d of FAR 52.204-8 on page 22 applies, and we have completed the reps and certs on SAM. I do see that page 7 requires an EMR letter. The bid should be submitted in Block 17 on page 2 of the SF1442. The following documents shall be provided in physical form at the time of bid opening: a. SF1442 with information completed by offeror on page 2. b. EMR Rating c. VAAR 852.219-75 (Page 42-44) completed by offeror. d. FAR 52.209-7 (Page 26-27) paragraph (b) filled out by offeror. e. Amendment 0001 acknowledgment Further documentation identified in the solicitation may be requested prior to award The magnitude of construction is between $1,000,000.00 and $2,000,000.00 All questions are due via email to the Contracting Officer by 12/15/2023 at 3:00 PM Contractor will have 300 days after receipt of NTP to complete the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$2,000,000.00

Public - Federal

Demolition, New Construction, Renovation, Site Work

27

27

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
282
Active Projects
116
Bidding Soon
2,437
All Active Projects
1,104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2024

March 4, 2024

img_map_placeholder

1400 Blackhorse Hl Rd, Coatesville, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.