Renovation of a water / sewer project in Guthrie, Oklahoma. Completed plans call for the renovation of a water / sewer project.

Quantity Unit Description 1.00 L.S. Lift Station Retrofit 1.00 L.S. Demolition 1.00 L.S. Temporary Bypass Pumping 1.00 L.S. Electrical System A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in herein. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered.

Award

Water / Sewer

$264,139.00

Public - City

Renovation

8

15

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Construction, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
40
Bidding Soon
482
All Active Projects
208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

November 30, 2023

img_map_placeholder

To Be Determined, Guthrie, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lift Station No. 4 Retrofit

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.