BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hot Springs National Park, Arkansas. Completed plans call for site work for a water / sewer project.

The City of Hot Springs, Arkansas (Owner) is requesting Statements of Qualifications (SOQ) from General Contractor Construction Manager (GC/CM) companies (Proposer) for pre-construction, procurement, construction management, and construction of the following Project packages: Owner will receive Statements of Qualifications (SOQ) demonstrating the Proposer's qualifications and the ability to provide GC/CM services for the Projects at the Davidson Wastewater Treatment Plant located at 320 Davidson Drive, and the Gulpha Basin Pump Station located at 109 Catherine Heights Road, both locations in Hot Springs, Arkansas. PACKAGE B Davidson Drive Wastewater Treatment Plant Improvements: Aeration system improvement to increasing the biological capacity from 12 MGD to 16 MGD, Increase the hydraulic capacity from 24 MGD to 48 MGD, Yard Piping Improvements, New secondary clarifier, new chemical feed building, new diesel driven electric generator with ATS. The contracting party shall not discriminate on the basis of race, sex, color, national origin, gender, sexual orientation, gender identity, or disability. It is the City's policy to encourage the involvement of Disadvantaged Business Enterprises (minority owned and women-owned businesses) in this contract award process. DBE's are particularly invited to submit statements, either as a prime contractor, subcontractor, or as a part of a joint venture. Non- DBE firms are encouraged to arrange subcontracts or joint ventures with DBE's prior to the submission of their response. The GC/CM Contract has an expected preconstruction services start date not later than January 15, 2024

Bid Results

Water / Sewer

$553,540.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
26
Bidding Soon
273
All Active Projects
124
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

January 15, 2024

img_map_placeholder

320 Davidson Dr, Hot Springs National Park, AR

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.