BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Batesville, Arkansas. Completed plans call for the renovation of a multi-residential development.

Bid guarantee in an amount equal to five percent (5%) of the bid price, the bid guaranty can bein the form of a certified check or cashiers check made payable to the PHA, a U.S. Government bond endorsed to the PHA, or a bid bond executed by the bidder in accordance with HUD-5369,Clause 9; (3) Representations, Certifications and Other Statements of Bidders - Public and Indian Housing Program Form HUD-5369-A; (4) A Non-Collusive Affidavitform which must be submitted ifyour bid is over $50,000.00; (5) Previous Participation Certification, Form HUD-2530, form which must be submitted if yourbid is over $50,000.00. (6) Certification of Bidder Regarding Section 3 and Segregated Facilities. (7) Contractors Section 3 Plan Format (8) Certification of Prime Bidder Regarding Equal Employment Opportunity. (9) Certification of Prime Bidder Regarding Non-Segregated Facilities. (10) Contractors Certification Concerning Labor Standards and Prevailing Wage Requirements. The successful bidder shall be required to furnish an Arkansas Performance and Payment Bond or Bonds on the form contained in the Contract Documents in the amount of 100% of the full amount of the bid. This is in accordance with Arkansas Code Annotated 19-11-405. Non resident contractors shall be required to comply with the requirements of Act 489 of 1989, pertaining to Contractors Bonds. The PHA reserves the right to reject any or all bids, separately orin their entirety; to accept or reject any Bid by line item; to waive any informalities in the bidding; to consider and award Bids in a manner that will be in the best interest and most advantageous to the PHA, to the lowest responsive and responsible bidder or bidders, as appropriate, whose bid or bids,as appropriate, conforms or conform, as appropriate, with all the material terms and conditions of the Invitation for Bids. No bid shall be withdrawn for a period of 60 days subsequent to the opening of bids without the consent of the PHA. It is intended that the contract shall include all materials, labor, equipment, services, etc. required for Installation of Range Outlet, Abandonment of Gas System, Condensation Line Replacement, TPR Valve Drain Line Improvements, and Electrical Improvements and All Related Items, as shown in the Drawings and described in the Specifications prepared by Miller-Newell Engineers, Inc., 510 Third Street, Newport, AR. The Contractor will not be required to perform work that is not within the general character and scope of the Drawings and Specifications or not reasonably inferable therefrom; however, he must recognize and accept the fact that these documents are not intended to illustrate or describe each and every possible detail of construction or finish that will be encountered in the execution of the work, nor can they show the exact location of each mechanical line, wiring device, fixture, etc. Where conditions are encountered that have not been specifically shown or detailed, they shall be worked out and finished similar to other details of like nature, or in accordance with supplementary Drawings furnished by the Engineer.

Award

Multi-Residential

$135,000.00

Public - City

Renovation

14

15

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
40
Bidding Soon
466
All Active Projects
196
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 11, 2024

August 12, 2024

December 10, 2024

img_map_placeholder

1530 E College Ave, Batesville, AR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.