BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a road / highway in Brush Prairie, Washington. Completed plans call for site work for a road / highway.

Involves replacing the existing breakaway cable terminals with current crash tested MASH end terminals traffic control and other work, Involves 26 items and 30 working days. Work class 11. County Clark County Cowlitz County Lewis County Estimated value $500,000 - $600,000 Contact Mike Briggs Project Engineer swgorgequestions@wsdot.wa.gov WADOT - I-5, I-205, SWR Breakaway Cable Terminal Replacement Freeways 21-23 Re-Advertise *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$611,233.00

Public - State/Provincial

Site Work

32

10

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
77
Bidding Soon
891
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2023

December 8, 2023

Project location map

Multiple Locations, Brush Prairie, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.