BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of a water / sewer project in Byron, Wyoming. Completed plans call for the renovation of a water / sewer project.

This Project consists of reviewing the findings of the WWMP to develop the overall project scope, gathering field survey, preparing design plans, developing an O&M manual, bidding documents, and completing construction management and administration during construction of the improvements. The Town intends to complete the engineering tasks of this project in phases as follows: Phase 1 - WWMP Review, Survey, Design, O&M Manual, and Bidding Documents Review the findings of the WWMP and develop an initial construction schedule Gather field survey necessary to complete the design of the Project, including but not limited to topographic survey, existing lagoon facilities, street and alley improvements, existing utility locations, and existing property improvements (i.e., fences, structures, etc.) Prepare preliminary design plans and preliminary O&M manual for review with Town Staff, utility owners, and property owners, and prepare preliminary cost estimates to assist in construction phasing decisions All Technical Questions Must Be Submitted in Writing (Email Preferred) Prior to Close of Business on Friday, October 27, 2023,1:00p.m. The Town of Byron (Town) is Seeking Statement of Qualifications (SOQ) Packages From Qualified and Experienced Individuals, Firms, and/or Teams to Complete All Work Associated With the Survey, Design, Bidding, and Construction Administration of the Wastewater Treatment Immediate Needs Project (Project). The Project Encompasses Upgrades to the Existing Wastewater Treatment Operations and Facilities as Well as Replacement of Portions of the Sewage Collection System as Funding Allows. The Town of Byron Reserves the Right to Accept or Reject Any or All Statements of Qualifications; to Waive Any Irregularities, Informalities, or Defects in Any Documents Which Shall Be Deemed in the Best Interests of the Town; and to Negotiate a Scope of Work and Fee Proposal With Any Selected Proponent. Statement of Qualifications (SOQ) Package Submission All Technical Questions Must Be Submitted in Writing (Email Preferred) Prior to Close of Business on Friday, October 27, 2023,1:00p.m. With Reasonable Efforts Made to Provide Written Responses Within Three (3) Business Days and to Be Posted on the Towns Website. All Technical Questions and Answers and/or Addendums Will Be Posted on the Towns Website. If Further Information is Desired, Please Provide Written Questions Only to: Allan Clark- Mayor / Mayor@byronwyoming.org

Post-Bid

Water / Sewer

$750,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
9
Bidding Soon
85
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2023

December 8, 2023

Project location map

To Be Determined, Byron, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.