BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Miami Lakes, Florida. Completed plans call for the renovation of a clubhouse / community center.

Roberto Alonso Community Center HVAC Replacement The Town of Miami Lakes is seeking proposals from a licensed and insured contractor for the replacement of one (1) of the HVAC infrastructures which currently includes two (2) separate units at the Miami Lakes Roberto Alonso Community Center. The system includes: one (1) system for the center's meeting rooms. All proposals will provide a "turn-key" solution and must include all costs, labor, machinery, tools, means of transportation, supplies, equipment, materials, services, and permitting to be considered a valid proposal. The current HVAC system is 15 tons Trane split unit. This unit is to be replaced with a similar or recommended unit. Any questions concerning the substance of this, or any other solicitation advertised by the Town must be submitted in writing to procurement@miamilakes-fl.gov while the Cone of Silence is in effect. No other communications, oral or otherwise, will be accepted. The Contractor shall obtain Substantial Completion of the Work within thirty (120) Days of the Notice to Proceed being issued by the Town. Contractor must obtain Final Completion within seven (10) Days after obtaining Substantial Completion. The scope of work includes, but is not limited to: - Conduct pre-construction walk-through to inspect and verify current unit and check measurements prior to purchasing unit. - Removal and disposal of existing HVAC system. - Installation of new HVAC system. - Match existing curb / modify as needed. - Permit fees associated with above-mentioned work. - Hook-up to existing duct-mounted smoke detectors. - Hoisting of above-mentioned equipment. - Startup of A/C equipment mentioned above. - Connection to existing HVAC control system. - Install all necessary wiring. - Any and all plumbing as-needed to remove or install new unit. - Include manufacturer's warranty as well as other warranty in accordance with the contract.

Bid Results

Clubhouse / Community Centers

$66,812.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
50
Bidding Soon
1,110
All Active Projects
502
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

December 11, 2023

img_map_placeholder

16500 NW 87th Ave, Miami Lakes, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.