BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Corte Madera, California. Conceptual plans call for site work for a water / sewer project.

The Marin Municipal Water District (District) is seeking request for proposals (RFP) from qualified professional engineering consultant firms for the Soulajule Pipeline Project (Project). Professional engineering services for this project shall include areas of Civil, Geotechnical, Land Survey, Environmental and Real Property and other disciplines necessary to fully design and construct the Project. The District will be requiring professional engineering services for the design of new pipeline from the point of termination of our Soulajule pipeline. The Soulajule pipeline conveys water from the Soulajule Pump Station and discharges the water onto a tributary that feeds Nicasio Reservoir (see Attachment C). The Project would tie into the existing pipeline discharge point and convey the water into the main body of the Nicasio Reservoir with a discharge structure. The Project will also conduct a condition assessment on the existing pipeline from the Soulajule Pump Station to the existing discharge point to evaluate any issues with the pipe and points of repair. Additional information can be found in the Scope of Work Attachment A of this RFP. Experience, qualifications and schedule will be key in the selection of the engineering firm. The Marin Municipal Water District was formed in 1912 and is the first municipal water district in California. Approximately 75 percent of our water comes from our local reservoirs on the Mt. Tamalpais watershed and west Marin. The remaining supply comes from the Russian River up north. The District serves approximately 191,000 residents in Marin County and operates seven surface water reservoirs, three water treatment plants, ninety seven pump stations, one hundred thirty potable water storage tanks and over nine hundred miles of pipe. The District understands that prospective consultant teams may have questions about the content and requirements of this RFP. Questions pertaining to the RFP may be submitted to aanaya@marinwater.org with a subject line of Soulajule Pipeline Project until 5:00pm on November 10th, 2023, 2023. At that time, all questions will be compiled, provided a response, and recirculated to all prospective teams. The compiled responses will also be available Electronically. It is anticipated the District will select the most qualified consultant team by December 1, 2023. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$500,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
45
Bidding Soon
1,755
All Active Projects
744
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2024

img_map_placeholder

Multiple Locations, Corte Madera, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.