BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in North Bay, Ontario. Completed plans call for the renovation of a transportation facility.

Reference Number 0000257941 Construction Management for Services and Construction for ONTCs Paint Shop Upgrade Projects. Ontario Northland Transportation Commission (herein referred to as ONTC) intends to retain a qualified firm to provide Construction Management services for the Construction of Paint Shop Upgrades at ONTCs North Bay Paint Shop. Construction Management services will include two phases, a pre-construction phase (Phase 1) and a construction phase (Phase 2). The pre- construction phase will take place independently for up to three separate projects. At the end of Phase 1, the Respondent shall prepare and submit a lump sum price proposal for the build of each project to ONTC for its approval. Phase 1 will be ongoing until approval is provided by ONTC for each project to proceed to Phase 2. This construction management approach must minimize costs to the owner, ONTC, associated with risk that a contractor carries in a lump sum price and eliminate multi-level mark-ups as well as risk associated with deliveries that are no longer dependable. The projects are at various points of engineering design. 1.Project 1: Blast Bay Upgrade; Target construction completion before March 15, 2025. 2.Project 2: Paint Bay Jack Pads; Target construction completion before March 31, 2024. 3.Project 3: Replace Smalls Paint Booth; Target construction completion before March 31, 2024. All projects will require a detailed, fast-tracked construction schedule and diligent on the ground coordination with ONTC Paint Shop supervision. The Place of the Work is located at 915/916 McIntyre St E, North Bay, ON P1B 1G2. The North Bay Paint Shop is a facility that is part of the North Bay Shop Complex. The building is generally a single-story paint shop that has elevated paint and blast bays. The Paint Shop was constructed in 1974 and is approximately 823 Sq. M. (8,868 Sq. Ft.) and the building was expanded in 2004 and the Paint Shop Expansion is 958 Sq. M. (10,314 Sq. Ft.) Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Transportation Terminals

$135,160.00

Public - State/Provincial

Renovation

101

28

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
4
Bidding Soon
71
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2023

December 18, 2023

img_map_placeholder

915 McIntyre St E, North Bay, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.