EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 8, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Haugan, Montana. Completed plans call for site work for a water / sewer project.

Contract Award Date: Feb 07, 2024 Contract Award Number: 1240LU24C0006 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: P2NHQGBL4VC1 Contractor Awarded Name: HASKINS EXCAVATING LLC Contractor Awarded Address: Superior, MT 59872 USA Base and All Options Value (Total Contract Value): $982,123.00 Notice ID Bid_Abstract Notice ID FinalQuestions_Answers GAOA Historic Savenac Water-Waste Water System Replacement on the Lolo National Forest Project is 100% Small business set-aside under NAICS code 237990 with size standard of $49.5 million. Per FAR 36.204, the estimated magnitude of construction is between $500,000 and $1,000,000. Bid opening will be held in Conference Room D at the Forest Service Office located at 420 Barrett Street in Dillon, MT. Electronic bid submission must be received by 5:00 PM the day before bid due date/opening. Period of Performance: 03/01/2024 to 10/01/2025 (a) Description of Work. This project will include the replacement of the water distribution system, wastewater system, and irrigation system at the Savenac Historic Tree Nursery. In general, the work under this Contract includes, but is not necessarily limited to, the following major items: 1. Replacement of the water distribution system. The project includes new water mains, and all associated valves, fittings, hydrants, service lines to buildings, a new water supply well and a new well house. 2. Replacement of the wastewater system. The project includes new sewer collection mains, manholes and service connections. The project also includes a new wastewater treatment system consisting of new septic and dosing tanks, a new force main and a new pressure dosed drain field. Abandonment of the existing septic tank and lift station is also part of the project. 3. Replacement of the irrigation system (Option Item). Installation of a new underground automatic sprinkler irrigation system. NOTE: Contractor will be responsible for obtaining all permits necessary to complete this project. (b) Project Location. The project is located on the Superior Ranger District, Lolo National Forest at the Historic Savenac Nursery in Haugen, Montana. (c) Price Range. Between $500,000 and $1,000,000. (d) Site Visit. No formal site visit is scheduled. Questions regarding the project may be directed to Nate Kegel, Lolo National Forest, at (406) 529-2726. (e) Pre-Bid Conference. No formal pre-bid conference is scheduled. (f) Start Work. The contractor may begin work upon issuance of a Notice to Proceed from the Contracting Officer. (g) Period of Performance. All work shall be complete by October 1, 2025 (h) Special Conditions. The site is currently used as a recreation rental with a seasonal visitor center. The contractor will be required to complete the drilling and installing of new well prior to proceeding with any other work items. The new well shall be installed between June 1, 2024 and October 1, 2024 (no site closures will be allowed for drilling and installing well). The contractor will be allowed to close the site from June 1, 2025, to October 1, 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question- The solicitation states 5 business days before closing which is now 1/25. Therefore, it would be 1/19 a Friday

Award

Water / Sewer

$982,123.00

Public - Federal

Site Work

28

17

39

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Central Heating Equipment, Fuel-Fired Heaters, Gas-Fired Unit Heaters, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Enclosed Bus Assemblies, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Bases, Ballasts, and Paving, Aggregate Surfacing, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Electrical Utility Transmission and Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
13
Bidding Soon
141
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

March 1, 2024

img_map_placeholder

To Be Determined, Haugan, MT

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

GAOA SAVENAC Waste Water Repairs, Lolo National Forest

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.