Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2025 at 7:00 PM
Updated February 13, 2025
Site work and paving for a civil project in Palm City, Florida. Design plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.
As of February 12, 2025, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence early August 2027 with construction Late 2027. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 04 Selection Method : Letter of Response and Abbreviated Technical Proposal Project Description : Resurfacing of SR-714/SE Monterey Road from S.W Palm City Plain Language Description : Resurfacing of SR-714/SE Monterey Road from S.W Palm City Rd. to 400 ft S of SR-5/US-1 The purpose of this project is to resurface the existing pavement, rehabilitate the roadway sections that are in distress, and restore the final surface on SR 714/SE Monterey Road from SW Palm City Road to 400 feet south of SR-5/US-1. Other objectives include the replacement of an existing 72- inch stormwater pipe from the south side of the existing box culvert at SR-714/SE Monterey Road and SE Rays Way intersection to the fork of SE Monterey Road extension. Additional services may include but are not limited to roadway design, lighting, signalization, signing and marking, survey, photogrammetry, and geotechnical. Number of contracts that may be awarded from this advertisement : 1 Advertisement Date 10/17/2023 Response Deadline Date/Time 10/31/2023 02:30 am Longlist Date/Time 11/03/2023 12:30 am Shortlist Selection Date/Time 11/13/2023 07:45 pm Technical Review Committee Meeting 1 Date/Time 12/11/2023 08:30 pm Final Selection Date/Time 1/08/2024 07:45 pm Negotiations Period Begin Date 1/13/2024 Negotiations Period Ending Date 4/01/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Resurfacing of SR-714/SE Monterey Road from S.W Palm City
Design
Roads / Highways
$9,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2027
FL-714, Palm City, FL
Related To This Project
Palm City, FL
--
Palm City, FL
Bid Date: Dec 05 2018
Palm City, FL
Bid Date: Dec 05 2018
Palm City, FL
--
Palm City, FL
Bid Date: Aug 14 2024
Palm City, FL
Bid Date: Nov 04 2024
Palm City, FL
--
Palm City, FL
Bid Date: May 07 2021
Palm City, FL
--
Palm City, FL
Bid Date: Sep 01 2023
Palm City, FL
Bid Date: Dec 16 2020
Palm City, FL
Bid Date: Dec 09 2020
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
