BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Eldridge, Iowa. Completed plans call for the addition of a 3,802-square-foot, one-story above grade laboratory facility; for the demolition of a laboratory facility; for the renovation of a 4,154-square-foot, one-story above grade laboratory facility; for site work for a laboratory facility; and educational facility.

Bid security shall be submitted with each bid in an amount equal to 5 percent of the base bid amount with the bid. Bid security shall be payable to the North Scott Community School District. Bid security shall be in a separate envelope labeled "Bid Security" The Owner reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the owner. All bidders must comply with applicable Iowa laws on public projects. Prime Contractor shall attend bi-weekly project meetings. Attendance is required at all meetings as sent out by Construction Manager to coordinate each trades work. 2. Prime Contractor shall provide background checks as required by state of Iowa for each person working on site. 3. Prime contractor shall provide all firestopping and fire caulking as required for their scope of work. 4. Prime Contractor shall complete daily reports each day and submit to construction manager. This shall include, at a minimum, on site manpower, inspections, and other events. 5. Include all field measurements to ensure materials will fit properly. Allow for typical construction tolerances. 6. Prime Contractor to include cutting and patching as required to execute scope of work. 7. Provide all layout required for this scope of work. 8. Provide all temporary facilities required for this scope of work. 9. Prime Contractor shall protect and preserve other Contractors' work, as well as all property of Owner and other entities not identified as part of construction in the Bid Documents. 10. Prime Contractor shall be responsible for loading, unloading, freight charges, and handling of all materials associated with its Work along with restoration, at its expense, of temporary or permanent subgrades, surfaces, protection, enclosures, disturbed by delivery, loading, unloading, handling, and hoisting. 11. Costs associated with re-testing and/or re-inspecting work that fails to comply with the contract documents will be charged to Prime Contractor. Prime Contractor shall cooperate fully with the independent testing and inspection agent to satisfy the Special Inspection requirements. 12. Prime Contractor shall plan to mobilize multiple times, if necessary, to complete its Work. 13. Prime Contractor shall clean up daily and dispose of excess waste materials and debris generated from its own Work. 14. Prime Contractor shall be responsible for keeping all streets, parking lots, and sidewalks clean from debris and mud as it pertains to its own Work. This shall include all contractor's vendors and subcontractors. 15. Prime Contractor shall provide construction layout, staking and surveying as required for the work. 16. Prime Contractor shall excavate and backfill its own work, along with any dewatering and temporary protection to protect the public, owner or other contractors from open excavations required to complete the work. 17. Prime Contractor shall immediately report to Bruce Builders damage to SWPPP measures in place. Prime Contractor shall be responsible for temporary protection and erosion control as required for their work. Prime Contractor shall be responsible for repair of damages to temporary erosion control measures that may be put in place as a result of their work. 18. Prime Contractor shall deliver/ turn over all attic stock items required by the specifications to the owner and at a location designated, by the owner. 19. Prime Contractor shall maintain an accurate set of As-Built Drawings throughout the duration of the project. The as-built drawings shall accurately show any and all deviations from the bid documents (e.g., deviations related to location, elevation, orientation, etc.). 20. Prime Contractor shall supply and install materials (as it pertains to its Work) for all mock-up(s) called out in contract documents Bid Result. Site Work and Concrete:KE Flatwork $208,000.00 Masonry: Otto Baum $225,540.00 Metal Wall Panels: Crawford Company $136,670.00 General Trades: Bill Bruce Builders $298,000.00 Roofing:Sterling Commercial Roofing $149,850.00 Painting:River Valley Construction $21,150.00 Mechanical: Ragan Mechanical $449,000.00 Electrical: Rock River Electric $257,171.00

Bid Results

Educational

$1,745,381.00

Public - City

Addition, Demolition, Renovation, Site Work

43

25

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
53
Bidding Soon
1,054
All Active Projects
407
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 9, 2023

December 11, 2023

img_map_placeholder

200 S 1st St, Eldridge, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.