BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 15, 2023 at 7:00 PM

Updated January 23, 2025

Renovation of a water / sewer project in Boston, Massachusetts. Completed plans call for the renovation of a water / sewer project.

Cruiseport Pier Rehabilitation - Repair of concrete pile supported deck structure at Flynn Cruiseport Boston. Work includes pier wall concrete encasement, beam repair, beam spall repair, deck spall repair, pier wall nosing and timber pile encasement. Work will take place within a confined space, below an active operating cruise terminal deck. Work area is subject to tidal inundation. To do so, the contractor shall bring its own harness and confined space entry permitting documentation. A tripod and ladder will be provided. contractors attending shall wear a reflective vest, hard hat, and steel toed boots. The estimated based bid cost is $13,384,000.

Bid Results

Water / Sewer

$9,598,458.00

Public - State/Provincial

Renovation

53

24

48

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
773
Active Projects
437
Bidding Soon
3,337
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2023

January 15, 2024

Project location map

1 Black Falcon Ave, Boston, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.