Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 15, 2023 at 7:00 PM
Updated January 27, 2024
Renovation of a clubhouse / community center in Marblehead, Massachusetts. Completed plans call for the renovation of a clubhouse / community center.
Estimated Cost $48,000 Removal and Installation of New Energy Efficient Gas Boiler at Community Center 1. Removal and disposal of all old equipment. 2. Install 2 Lochinvar KHB285N or equivalent gas boilers w/ 50 lb. relief valve. 3. Replace LWCO. 4. Replace Flow Switch. 5. Replace existing circulators. 6. Check amperage of new circulators for compatibility with existing motor starters 7. Replace existing air separator. 8. All necessary pipe & fittings to manifold boilers together and tie into existing system. 9. All electrical wiring - use outside reset. 10. Venting to be either polypropylene pipe or Ipex cpvc pipe 11. Smoke pipe plugs for existing boiler flues. 12. Install future tees for possible indirect hot water tank. 13. Responsible for all required permits and inspections. WORK SCHEDULE Work on this project is restricted to a normal five-day week, with the Prime Contractor and all subcontractors working on the same shift. No work will be allowed on the project on Sundays and Holidays. Work hours shall be within 7AM to 5PM. Changes to these restrictions can be changed if be approved in writing by the Town.
Post-Bid
Clubhouse / Community Centers
$48,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2023
December 4, 2023
12 Humphrey St, Marblehead, MA
Related To This Project
Marblehead, MA
Bid Date: Nov 09 2023
Marblehead, MA
--
Marblehead, MA
Bid Date: Nov 07 2023
Marblehead, MA
Bid Date: Mar 15 2024
Marblehead, MA
Bid Date: May 17 2019
Marblehead, MA
Bid Date: Sep 03 2025
Marblehead, MA
Bid Date: Sep 17 2025
Marblehead, MA
Bid Date: Feb 09 2024
Marblehead, MA
Bid Date: Oct 12 2023
Marblehead, MA
Bid Date: Jun 22 2022
Marblehead, MA
Bid Date: Jun 22 2022
Marblehead, MA
Bid Date: Mar 10 2022
Marblehead, MA
Bid Date: Mar 17 2022
Marblehead, MA
Bid Date: Mar 16 2022
Marblehead, MA
Bid Date: Mar 03 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
