BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Auburn, Alabama. Completed plans call for site work for a road / highway.

Scope A new pole with appropriate guide wires will be installed in the same location as the existing pole. Replacement of this pole will require the power supply to fish houses be disconnected. A temporary generator will need to be used to supply power to fish houses while repairs are being made. A new mounting structure for the electrical equipment will also be installed in the same location as the existing mounting structure. All work will conform to all relevant and enforceable electrical codes and industry standard practices for such installations. (PER ATTACHED SPECIFICATIONS) o Disconnect main overhead powerlines from the existing pole and isolate to provide a safe workplace. Temporary power to the fish houses and water pumps will be provided by existing emergency generator. Disconnect existing generator from the existing leaning pole and electrical equipment. Move all electrical equipment, (panel, breakers, transfer switch, etc.) in the current location that is necessary to use to continue power supply to fish houses and pumps by the emergency generator from the existing pole and install on temporary pole at a location suitable for the Lab personnel. Energize emergency generator and temporary panel to the 5 fish houses and water pumps and test for reliability. o Remove old pole and install new pole of appropriate size. o Install/anchor guide pole with guide wire on opposite side of concrete slab. o Install guide wire from new power pole to new guide pole. o Upgrade structure holding the electrical panels and transfer switch with rust resistant metal or approved, electrical rated, commercial synthetic material components. o Remove and appropriately dispose of all old unused electrical boxes/equipment. o Upgrade electrical panel with new 400-amp, 44 space, outdoor panel, and new breakers. o Install new grounding rods as required by electrical code for new panel. o Install new wires and conduit from panel up to overhead lines. o All newly installed electrical connections and components (panels, breakers, etc.) on the new mounting structure, including existing transfer switch, must function properly and be accepted by Lab personnel after the emergency generator is re-hooked up to the new power pole. Test emergency generator connection to the new pole to ensure that it's operable. Contractor will verify all dimensions and site conditions prior to beginning work. Contractor shall provide labor, specified materials, equipment, and tools required to perform the job fully and completely. Contractor will submit detailed submittals for approval by the site Research Leader prior to ordering and installing any equipment. Installation of equipment will not interfere with research and will be always coordinated with the site Research Leader. The contractor shall always be responsible for safeguarding all Government property and his work and ensuring the safety of his crew and ARS employees. The Contractor is required to secure their equipment and leave the site prior to lock down of the facility each day. The premises shall be left in a clean, orderly, and acceptable condition. The Government is not responsible for loss or damage to the Contractors' equipment during the contract. Government Furnished Property and Services The Government shall provide, without cost, the materials and services listed below. The Government will provide Utilities (power, water, etc.) where available The Government will not provide any materials, equipment, or fuel The Government will not provide any equipment or services SITE VISIT scheduled for Monday, December 4, 2023, at 10:00 am. Please contact Cecilia McNamee at cecilia.mcnamee@usda.gov for specifics.

Post-Bid

Roads / Highways

$29,129.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
27
Bidding Soon
556
All Active Projects
233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.