BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2023 at 7:00 PM

Updated January 27, 2024

Site work and new construction of a pre-engineered storage facility in Tyndall, South Dakota. Completed plans call for the construction of a 11,250-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Bon Homme County is seeking bids to construct a 90' x 125' x 18' steel framed insulated storage building to be constructed in Tyndall, South Dakota. The building to be a ridged frame with a clear span design and beam end walls. New construction shall be attached to north end of an existing 65' x 145' steel framed structure and flush with the west (rear) wall. All bids shall include all associated costs to include materials, equipment costs, labor and other costs to construct a complete and operational structure. Such bids to include all associated costs; which includes materials, equipment costs, labor and other costs to construct a complete and operational structure. All bids shall include building and construction plans. One 90 x 125 x 18 steel-framed, insulated storage building. The Board of Commissioners of Bon Homme County, Tyndall, South Dakota, reserves the right to reject any or all bids.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$583,925.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
40
Bidding Soon
369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

March 15, 2024

Project location map

To Be Determined, Tyndall, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.