BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Atherton, California. Working plans call for site work for a service station / car wash facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of December 11, 2023. Project didn't move forward with the vendor. The request for proposals will be made available in 2024..** The Town of Atherton is requesting proposals from qualified, experienced, and bonded firms in the State of California to provide electric vehicle charging infrastructure installation in two parking lots at Holbrook Palmer Park (150 Watkins Avenue). The Town desires to enter into an agreement that covers the complete installation of four (4) Level 2 EV ports at the Entry Lot and four (4) Level 2 EV ports at the Jennings Pavilion including installation of new subpanels, ADA compliance, striping, repaving, and purchase of all materials needed such as charging stations. Installation should be completed using the Charging Evaluation Reports, which was technical support provided by Peninsula Clean Energy to identify locations, existing conditions, and design. Communications: Town Staff may be contacted to obtain additional information; however, any such oral communication will not be binding on the Town. All questions regarding this project should be directed to, Rachael Londer, Management Analyst II at 650-752-0577, or by e-mail at: rlonder@ci.atherton.ca.us The site evaluation included the following steps: o Discussion with Town of Atherton started on 2/2/2022 to identify objectives for the project o Remote data collection and review, including: a. Information submitted by Town of Atherton in the program application b. Aerial/satellite imagery from Google Earth c. Annual energy and demand data from Peninsula Clean Energy d. Local distribution system electrical infrastructure published by PG&E o A site walk by CLEAResult staff that gathered the following additional detail: a. Electrical panel location, capacity and utilization b. Candidate charging locations and surface conditions c. Distance measurements o "As Built" architectural drawings were available o An available capacity estimate was completed by CLEAResult Engineer, Andy Lentz The Solutions recommended have also been designed to address the following utility needs: o The available capacity of the utility service is calculated to be sufficient a. No engagement with the utility is required

Final Planning

Service Station / Car Wash

$77,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
77
Bidding Soon
1,542
All Active Projects
669
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2023

June 11, 2024

img_map_placeholder

150 Watkins Ave, Atherton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.