BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Renovation of a water / sewer project in Bozeman, Montana. Design plans call for the renovation of a water / sewer project.

As of June 20 2025 this is in preliminary design phase. Hydraulic capacity improvements for the existing treatment processes employed at the Water Reclamation Facility (WRF) are necessary to meet the 20-year planning horizon of the facility. The anticipated 20-year flow rate is 14.6 million-gallons-per-day (mgd) average daily design flow identified in the 2022 WRF Facilities Plan. The existing WRF average day design capacity is 8.5 mgd. The 2022 WRF Facilities Plan identifies existing process improvements necessary to increase the base hydraulic capacity to 14.6 mgd and when these improvements are needed. A phased approach is called for, since some process elements have more current available capacity than others. Base hydraulic capacity improvements are intended to maintain the current treated effluent performance levels of the WRF and are not designed to further reduce effluent nutrient (nitrogen and phosphorus) concentrations. Phase 1 base hydraulic capacity improvements identified in the 2022 WRF facilities plan update include the construction of a 4th anaerobic digester, uv disinfection capacity additions, piloting of indense process to enhance and optimize existing bioreactor phosphorous removal, and full-scale installation of indense process after piloting. This project also includes renovation of existing lined solids piping restricted by struvite. Struvite accumulates in pipes at water reclamation facilities over time and restricts flow of materials in those pipes. The total project cost is expected to be $10,730,000 including $9,122,400 which will be spent prior to the capital planning period 2026-2030. As of January 7, 2025, this project is included in the city's 2026-2030 Capital Improvement Program (CIP) Page no.273 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope has not been released. As of November 8, 2024, this project is in design. The construction document completion timeline has not been released. Construction is slated to begin late 2025. However, the firm timeline has not been disclosed.

Design

Water / Sewer

$1,607,600.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Bozeman, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.