Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Athens, Ohio. Completed plans call for the renovation of a educational facility.
Submit all questions regarding this RFQ in writing to Jordan McCoy at mccoyj2@ohio.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted Electronically The purpose of the project is to connect Memorial Auditorium to the campus chilled water distribution system for cooling the Memorial Auditorium Building, which also feeds the Galbreath Chapel. Replacement of theater lighting controls including dimmer racks and house lighting is also included to improve the first experience for students at the University during Bobcat student orientation. Deferred maintenance issues with the chiller, which is 30+ years old and nonfunctional, are the reason for the need. An existing smaller ice chiller is functional in the building currently at half capacity and is not supplying the cooling needs for Memorial Auditorium and Galbreath during the summer months. Lighting repairs will help with safety concerns of dark areas of the theater. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owners policies and procedures. A tie-in to the campus chilled water distribution system on University Terrace will be required, including the necessary pumping changes and controls additions/upgrades. Replacement of the theater lighting controls, including dimmer racks and house lighting, will also be included. As required by the Agreement, and as properly authorized, provide the following categories of services: develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Schematic Design, Design Development, Subcontractor Prequalification and Bidding process, Construction Documents, Construction and Closeout stages. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each The preconstruction and construction services are generally described below. Subcontracts including Plumbing, Fire Protection, HVAC, and Electrical trades will be awarded by the DB to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority and the Owner, the Criteria A/E and the DB. The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the DB's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The DB will work cooperatively with the Contracting Authority and/or Owner, Criteria A/E and Project Team, and will provide, among other services, schedule development, estimate development, program verification, schematic design, design development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, construction documents preparation, constructability review, permits, budgeting, value engineering, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at a stage of completion specified in the Agreement, such partially completed documents (the Basis Documents) shall be provided to the DB, together with the Architect/Engineer of Records (AOR) detailed listing of any incomplete design elements and the AORs statement of intended scope with respect to such incomplete elements (the Design Intent Statement). Contingent upon the Contracting Authoritys approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (GMP Amendment). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the DB and seek proposals from other firms for completion of the Project. Construction Services: The DB shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The DB shall hold all subcontracts and shall be fully responsible for the means and methods of construction, weekly progress meetings, testing and inspections, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1- 03-02. The Contracting Authority reserves the right to approve the DBs selection of subcontractors and any supplemental terms to the subcontract form. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method (Design-Build) 2. Role on Project (Design-Build) 3. Experience with design and implementation of campus utility distribution systems 4. Experience with design and implementation of lighting control systems Total Project Cost $1,700,000.00 State Funding $0.00 Construction Cost $1,500,000.00 Other Funding $1,700,000.00 Evaluation Criteria for Selection Selection Criteria: The DB will be selected using (i) qualifications-based process during the Request for Qualifications (RFQ) stage to develop a short list and (ii) best value process during the Request for Proposal stage. The qualifications based criteria for the RFQ is included in this announcement. The best value criteria used in evaluating proposals from short listed firms will include such factors that are determined to derive or offer the greatest value to the State and Owner, combining both qualifications and fee. Short List: Each firm responding to this RFQ will be evaluated and selected based on its qualifications and the qualifications and experience of the particular individuals identified as the candidates proposed team for the Project. After evaluating the responses to this RFQ, the Contracting Authority will select a short list of no fewer than three candidates that it considers to be the most qualified, except if the Contracting Authority determines that fewer than three firms are qualified, it will only select the qualified firms. Request for Proposal: The short-listed firms shall be sent a Request for Proposal (RFP) that will invite the firms to submit pricing proposals containing their proposed preconstruction stage compensation, construction stage personnel costs, itemized construction stage general conditions costs, construction stage contingency percentage, construction stage design fee percentage, and design-build fee percentage. The short-listed candidates will also receive (i) form of the Agreement with the Contracting Authority containing the contract terms and conditions, (ii) set of the most recent criteria documents and (iii) proposed Project schedule. Pre-Proposal Meeting: Prior to submitting a response to the RFP, the short-listed firms will be invited to meet individually with the Contracting Authority and the Owner. The purpose of the pre-proposal meeting is to permit the short-listed firms an opportunity to ask the Contracting Authority and the Owner questions in an individual setting to help the firms prepare their responses to the RFP. The Contracting Authority will notify each short-listed firm to schedule individual times for the pre-proposal meetings. Interview: After submitting responses to the RFP, the short-listed firms will be interviewed by the Contracting Authority and representatives of the Owner. The purpose of the interview will be to meet the proposed Project team, become familiar with key personnel, and understand the project approach and ability to meet the stated objectives for the Project. Please be prepared to discuss with specificity the firms capacity to conduct this work in compliance with the timetable, budget and EDGE expectations. The Contracting Authority will notify each short-listed firm to schedule individual times for the interviews. RFP issued to the Short-Listed Firms 11.17.2023 Interviews 12.05.2023 Selection of DB 12.08.2023 The Contracting Authority reserves the right to reject all proposals and cancel at any time for any reason this solicitation, any portion of this solicitation or any phase of the Project. The Contracting Authority shall have no liability to any proposer arising out of such cancellation or rejection. The Contracting Authority reserves the right to waive minor variations in the selection process. If the DB firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms signed by both parties with its Statement of Qualifications. For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will participate in the delivery of the proposed professional services solicited in the RFQ. Interested DB firms must indicate on their Statement of Qualifications, the locations where their services will be performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of Qualifications to be rejected. G. Submittal Instructions :Electronic submittals should be combined into one PDF file named with the project number listed on the RFQ and your firms name. Use the print feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then PDF Optimizer. Also, please label the CD or DVD and the sleeve with the project number and firm name if applicable. Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or coverings of any type. Cover letters and transmittals are not necessary. Facsimile copies of the Statement of Qualifications will not be accepted. Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a maximum file size of 25 MB. Unless otherwise noted or exempt, all documents submitted to the Contracting Authority in response to this RFQ and subsequent RFP are public and will be available for inspection at the conclusion of the selection process. The following information shall remain confidential and will not be released: (1) Proposal Form(s), except for cost category subtotals which will be transferred to the Best Value Rating Form; (2) Financial Capacity; and (3) Bonding/Insurance. Proposers are requested to submit the following information in response to this RFQ within Section H of Form F110-330. 1. Summary: Provide a summary, one page or less, describing why your firm/team is the most qualified for the Project. 2. Bonding/Insurance: Provide evidence of capacity to provide bonding in the amount of the construction budget (e.g. a letter from your Surety agent stating that one or more Sureties will issue Bonds in the amount of the construction budget if your team is selected) and a copy of the firms certificate of insurance showing the firms current limits of liability for commercial general liability, employers liability, business automobile liability, and professional liability insurance. 3. Management Systems: Describe the scheduling and cost control systems the firm would propose to use for the Project. 4. Self-Performed Work: Indicate whether the firm intends to self-perform any work on the Project through a competitive process and, if so, the nature of the work and capability to self-perform. 5. Estimating: Demonstrated track record of performance of in-house estimating on projects comparable to the Project. 6. Scheduling: Demonstrated track record of performance of managing projects to the original schedule. Firms are requested to identify professional registrations, memberships and credentials including but not limited to: LEED GA, LEED AP, LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials. Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
Post-Bid
Theaters / Auditoriums
$1,500,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2023
March 1, 2024
33 University Terrace, Athens, OH
Related To This Project
Athens, OH
Bid Date: Nov 20 2023
Athens, OH
Bid Date: Dec 14 2023
Athens, OH
Bid Date: Nov 14 2023
Athens, OH
Bid Date: Nov 21 2023
Athens, OH
Bid Date: Dec 21 2023
Athens, OH
Bid Date: Dec 19 2023
Athens, OH
Bid Date: Dec 14 2023
Athens, OH
Bid Date: Dec 13 2023
Athens, OH
Bid Date: Oct 30 2023
Athens, OH
Bid Date: Dec 12 2023
Athens, OH
Bid Date: Nov 02 2023
Athens, OH
Bid Date: Aug 01 2024
Athens, OH
Bid Date: Oct 06 2023
Athens, OH
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.