BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Lodi, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

This project consists of removing and replacing approximately 30 linear feet of 48" storm drainage culvert, reconstructing headwalls on each end, constructing concrete aprons on each side, repaving the access road above the culvert, and other incidental and related work. Due to planned dam maintenance, construction shall commence on February 5, 2024 (when the Lake is emptied) and be completed within 21 days Calendar Days (before the Lake gets filled back up).

Award

Bridges / Tunnels

$148,500.00

Public - City

Paving, Site Work

4

6

2

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
209
Bidding Soon
3,102
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2023

February 5, 2024

Project location map

1101 W Turner Rd, Lodi, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.