BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Conroe, Texas. Completed plans call for site work for a bridge / tunnel.

Culvert Replacement at Post Oak Rd. and Live Branch Creek Precinct 1. A Bid Bond from an approved surety company-holding permit from the State of Texas will be required. The Bid Bond must be in the amount of five percent (5%) of the total bid amount and must accompany each bid. If applicable, the successful bidder will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the project. All bids shall be submitted on the basis of lump sum as provided in the bid specifications. Payment to successful bidder shall be net thirty (30) days after receipt of products, materials, services or invoices, whichever is later unless otherwise stated in specifications. A prevailing wage rate has been prescribed for this project. Montgomery County is an Affirmative Action/Equal Opportunity Employer. For any questions relating to the specifications or the submission of this bid, contact Andreea Kovacs, Procurement Project Manager - Construction, via email at andreea.kovacs@mctx.org, or by calling 936.539.7927 Your consideration of this proposal is appreciated. The right is reserved, as the interest of Montgomery County Commissioners' Court may require rejecting any one or all bids and to waive any informality in bids received. All bids received after the above designated closing time will be returned unopened. This project replaces the culvert under Post Oak Rd at Live Branch Creek which is located 0.33 miles north of FM 830. This project replaces two pipes crossing Post Oak Rd with two 8'x8' box culverts. The above description of the scope of work is general in nature and is only intended to provide an overview of the project. The complete detailed scope of work and bid items are contained in the plans and specifications. The contractor will have 90 calendar days to complete the project.

Bid Results

Bridges / Tunnels

$296,575.00

Public - County

Site Work

47

6

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
7
Bidding Soon
2,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2023

December 15, 2023

Project location map

Multiple Locations, Conroe, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.