BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Saint Paul, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Trout Brook Interceptor Repair Project STA. 135+00 to 180+50 Site Directions: Rice Street and Cottage Avenue West Direct inquiries can be made to Owners Representative, Joe Welna at Barr Engineering Co. at 952.832.2766 or jwelna@barr.com. Est. Completion Date: April 30, 2024 Project work repairs of the Trout Brook Interceptor (TBI) between station 135+00 to 180+50. Specific work is as follows: 1. Mobilize labor, equipment, materials, and temporary facilities 2. Install safety measures, establish limits of staging, and protect all existing utilities, trees and structures as specified on the plans. 3. Install water management, erosion control, and traffic control components. 4. Type 1 - Concrete Surface Repair, 1/2" - 2-1/2" 5. Type 2 - Reinforcement Repair 6. Type 3 - Crack Repair 7. Furnish Hydrophilic Grout 8. Type 4 - Reinforcement Spacer Repair 9. Type 5 - Fracture Repair 10. Type 6 - Tap Repair 11. Type 7 - Install Manhole Steps 12. Type 8 - Invert Point Repair 13. Type 9 - Concrete Demo and Patching Repair 14. Type 10 - Invert Concrete Debris Removal 15. Restore all areas directly or indirectly disturbed by the Work to the pre-existing conditions. 16. Demobilize from the site after work is complete. Project Scope of Work Access/Stagingo Two primary access locations were reviewed during prebid meeting and are shown on drawings as Prebid Location # and Prebid Location #2. Other potential access location are shown on the drawings. Two potential staging areas were viewed during meeting and are shown on the drawings. Contractor will be required to obtain appropriate permits from the City of St. Paul ROW for use of these staging areas. Mayre Street Staging Area is located near downstream end of project near Sta 135+00. Willow Reserve Staging Area is located at upstream end of project near Sta 178+00. Erosion and Sediment Control CRWD wants to ensure its projects are good examples of proper sediment and erosion control Questions Due: 11/02/2023 @ 10:00 am through QuestCDN or by email to Joe Welna

Bid Results

Roads / Highways

$999,101.00

Public - City

Paving, Site Work

26

17

4

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
86
Bidding Soon
828
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

December 11, 2023

img_map_placeholder

W Cottage Ave & Rice St, Saint Paul, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.