EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 18, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Blauvelt, New York. Completed plans call for the renovation of a educational facility.

EC-01 Budget: $1,250,000 It is the sole responsibility of the bidder to ensure that the bid is received at the designated location prior to the designated time for opening bids. Checks or Money Orders shall be made payable to; South Orange town Central School District. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders, to all submitting Bids. Any Bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may be issue. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. A Bidder, upon 1) making the deposit required for the Bid Documents, 2) submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids, and 3) returning the plans and specifications used by such Bidder in good condition within thirty (30) days following the award of the Contract, or rejection of the Bid, shall have returned to them the full amount of the deposit for one copy of the plans and specifications. The South Orange town Central School District hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be in the best interest of South Orange town Central School District. A Bid Bond or Certified Check in the amount of five percent (5%) of Base Bid is required and must accompany proposal. Performance Bond and Labor Material Payment Bond equal to one hundred percent (100%) of Contract Sum are required to be delivered at time Contract is signed with Owner. Attention of the Bidder is particularly called to the following: - The Owner's sales tax exemption. - The requirements as to conditions of employment. - The minimum wage rates to be paid under the contract. - The requirements pertaining to certification of Non-Collusion in preparation of proposals submitted for this Project. No bidder may withdraw their bid within forty-five (45) days after date of bid opening. In addition, the Bidding Documents for this project contain detailed requirements for the qualification of Bidders as follows: - Rigid bonding and insurance requirements. - Financial statements and bank references. - Lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party. - A statement of Surety's intent to issue Performance and Payment Bonds. - A description of other projects of similar size and scope completed by the Bidder. Bidders will comply with New York State prevailing wage and supplement requirements. WilliamO.SchaeferElementary:SED#50-03-01-06-0-012-019 CottageLaneElementary:SED#50-03-01-06-0-010-022 TappanZeeHighSchool:SED#50-03-01-06-0-006-032 WilliamO.SchaeferSound&Lockdown:SED#50-03-01-06-0-012-020 CottageLaneSound&Lockdown:SED#50-03-01-06-0-010-023 CottageLaneLibrarySound&Lockdown:SED#50-03-01-06-8-023-002 WOSOutdoorClassroom:SED#50-03-01-06-7-053-001 CLEOutdoorClassroom:SED#50-03-01-06-7-054-001 SOMSOutdoorClassroom:SED#50-03-01-06-7-056-001 TZHSOutdoorClassroom:SED#50-03-01-06-7-055-001 RegistrationExpirationDates: LaurenTarsio 09/30/26 AnthonyMarchetti 05/31/24 RichardWaite 11/30/23 DaveHart 02/28/25 LarryWerts 12/31/24 JenniferWengender 06/30/24 Certificate# 018330 ContractorshallcompleteworkoftheirContractperthefollowingSchedule: MILESTONES 1. April 5,2024- a. Curbssetforall2024scheduledworkCLESandWOS. b. Nurses Office Abatement complete, temporary floors 2. June 27,2024- a. Full Mobilization all Trades 3. August 27,2024- a. Substantial Completion Summer 2024 work including WOS Nurse's Suite, All Exterior Classrooms, CLES Fitness Path, Sound & Lockdown 4. June 30, 2025- a. Remobilization all Trades 5. August 26, 2025- a. Substantial Completion Summer 2025 work 6. November4,2025- a. Final Completion All work

Award

Educational

$3,076,000.00

Public - State/Provincial

Renovation

293

25

117

6

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Millwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Static-Control Resilient Flooring, Terrazzo Flooring, Carpeting, Tile Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Panel Signage, Interior Specialties, Compartments and Cubicles, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Terminal Units, Central Cooling Equipment, Refrigerant Condensers, Air-Cooled Refrigerant Condensers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Pathways for Communications Systems, Commissioning of Communications, Data Communications, Data Communications Network Equipment, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
547
Active Projects
327
Bidding Soon
5,039
All Active Projects
2,357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

January 29, 2024

img_map_placeholder

160 Van Wyck Rd, Blauvelt, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

South Orangetown Central School District 2022 Bond Project - Phase 1 (Electrical Contract - 01 )

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.