Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Phoenixville, Pennsylvania. Completed plans call for site work for a water / sewer project.
Repair of tanks and replacement of equipment for the existing primary clarifiers. The Work to be done under this contract consists of all labor, equipment and materials to remove the existing sludge collection units, weirs, valves, and gates, repair the tank concrete and any associated structural modifications, coat the tank, and install new sludge collection units, weirs, valve, and gates, in the primary clarifier tanks as shown on the Drawings and described in the Specifications. Question Deadline 11/02/2023 at 4:00 PM ET Questions regarding this project must be submitted online via electronically. All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer by clicking on the Questions tab within electronically. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. A Bid must be accompanied by Bid security made payable to Owner in an amount of ten percent (10%) of Bidder's maximum Bid price and in the form of a certified check, bank money order or a Bid Bond (on the form in Project Manual or equivalent) issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions. Contract Documents, the Performance Bond and Payment Bond in the forms included in the Contract Documents or equivalent each in an amount of 100% of the contract amount, in favor of Owner, as required for the faithful performance and proper fulfillment. Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by such Bonds and required insurance certificate(s). Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $1,000.00 for each day that expires after the time specified in Paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $1,000.00 for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. All bonds and insurance required by the Contract Documents to be purchased and maintained by Owner or Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry, and weekly certified payrolls will be required attesting to this. The Owner reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to wave any informality in the bids.
Award
Water / Sewer
$3,818,180.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2023
December 11, 2023
To Be Determined, Phoenixville, PA
Related To This Project
Phoenixville, PA
--
Phoenixville, PA
--
Phoenixville, PA
--
Phoenixville, PA
--
Phoenixville, PA
--
Phoenixville, PA
--
Phoenixville, PA
Bid Date: Jan 12 2024
Phoenixville, PA
--
Phoenixville, PA
Bid Date: Dec 19 2019
Phoenixville, PA
--
Phoenixville, PA
Bid Date: Sep 27 2023
Phoenixville, PA
Bid Date: Aug 31 2022
Phoenixville, PA
Bid Date: Oct 02 2023
Phoenixville, PA
--
Phoenixville, PA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.