BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Marietta, Georgia. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000332391 Effluent filter improvements for the 12 million gallon per day (mgd) Northwest Cobb Water Reclamation Facility (WFR) and for the 20 mgd Noonday Creek Water Reclamation Facility. Question Acceptance Deadline 11/07/2023 05:00 PM EST Questions are submitted online No Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- The successful bidder for this contract will be required to furnish a satisfactory performance bond and and material payment bond, each in the amount of one-hundred percent (100%) of the bid. Owner reserves the right to waive any informality or to reject any or all bids, to evaluate bids, and to accept any bid which in its opinion may be for the best interest of Owner. Any bids submitted that do not include a duplicate of Section 00300 and a copy of the bid bond as specified in the Instructions to Bidders may be rejected. The Project consists of effluent filter improvements for the 12 million gallon per day (mgd) Northwest Cobb Water Reclamation Facility (WRF) and for the 20 mgd Noonday Creek Water Reclamation Facility. The contract time for construction of the project is 730 calendar days (two years). The project consists of the following major items: Northwest Cobb WRF Filter Upgrades: Replacement of four sand filter systems in Filter Basins 1-4 at Northwest Cobb WRF with AquaDiamond cloth media filter systems. Installation of a canopy at Filter Basins 1-4 at Northwest Cobb WRF Upgrades to yard piping into and out of the filter basins as shown on the drawings at Northwest Cobb WRF. Installation of a new plug valve to cut off flow to the existing Filter Basins 5-8 at Northwest Cobb WRF. Installation of new weirs for the filter basins. Demolition and disposal of equipment and materials, as shown on the drawings. Instrumentation and electrical system upgrades to accommodate the above improvements. Concrete crack repair PROJECT LOCATION: 3740 HWY 293 (OLD41) KENNESAW, GA 30144, 415 SHALLOWFORD ROAD KENNESAW, GA 30144

Bid Results

Water / Sewer

$21,884,000.00

Public - County

Renovation

96

26

27

5

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
49
Bidding Soon
1,465
All Active Projects
529
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

January 15, 2024

img_map_placeholder

Multiple Locations, Marietta, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.