EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 14, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Palos Heights, Illinois. Working plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

** As of 11/17/23, No bids received and project is tabled for now. The City is reviewing their options. The City of Palos Heights is accepting bids from experienced and qualified contractors for the 2023 Public Sidewalk and Signal Improvements. Scope of Work: Installation of a new sidewalk from the intersection of Rte. 83 along Ridgeland Ave. to the existing Cal Sag Trail. The work will include the construction of new pedestrian signal heads, combination concrete curb and gutter, directionally bored conduit, concrete sidewalk, and restoration of disturbed areas. Bid Bond: 5%

Final Planning

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

35

8

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
133
Bidding Soon
2,193
All Active Projects
938
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2023

May 17, 2024

img_map_placeholder

IL-83 & Ridgeland Ave, Palos Heights, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2023 Public Sidewalk and Signal Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.