BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Keller, Texas. Completed plans call for site work for a water / sewer project.

Bids shall be submitted in sealed envelopes upon the blank forms in the Contract Documents section. The entire Contract Documents booklet must be returned in a sealed envelope with the following forms filled out and signed; Bid Form, FormTCG2270, Form CIQ, Form CIS, Vendor Compliance to State Law form, Contractor Compliance to Texas Sales Tax Code form, and the Standard Form of Agreement For questions regarding this addendum contact: Aubrey Brockman (806) 224-1215 aubrey.brockman@kimley-horn.com Rehabilitation of the Pearson Ground Storage Tank #2 (Concrete). Exterior Cleaning and surface preparation System (Water blast clean the exterior surface of the dome, the dome ring, and the exposed tank wall). Exterior Coating (Apply two coats of a non-cementitious 100% acrylic coating to the exterior surface of the dome, the dome ring and the tank wall & apply two coats of a water-based acrylic sealer to the exterior surface of the tank wall. Interior cleaning (Water blast clean the interior surface of the tank wall and floor and remove up to 1/2 " of sediments on the tank floor.) Interior Pipe Preparation and painting. Re-Service the Altitude Valve. Furnish and Install Vault Ladder. Remove and replace exterior tank ladder fall protection system. Remove and replace interior tank ladder and fall protection system. Blast and recoat the existing overflow flap valve. Install new confined space signage. Power wash manway. Site grading along Splash Pad. Hydro-Mulch Seeding. Remove & re-install center dome vent screen. Furnish & Install dome safety cables. Replace lightning Protection System. Videotape the construction. Prepare, Install, and remove SWPPP. Disinfection and Bac-T sampling of the tank. Electrical work. Instrumentation & SCADA. Project Bonds and Insurance. Mobilization & Demobilization. Construction Contingency. Remove and replace roof access hatch. This is Alternative Bid #1. The Owner reserves the right to adopt the most advantageous construction thereof, or to reject any or all bids. No bid may be withdrawn within forty-five (45) days after date on which bids are opened. cost estimate the range is 450K to 650K. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$454,181.00

Public - City

Site Work

28

20

5

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
97
Bidding Soon
3,578
All Active Projects
1,423
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

December 18, 2023

img_map_placeholder

416 N Pearson Ln, Keller, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.