BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Santaquin, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Due to this requirement, Santaquin is reissuing a Request for Bids for the Santaquin Main Street Project with the following adjustments: 1. Alternate A: Project completion date: May 31, 2025 2. Alternate B: Project Completion date: May 31, 2025 3. Alternate C: Project Completion date: October 15, 2025 4. Division 1M.1.07 (Page 1M-4): removed "Installation of power, telecommunications, and gas lines is planned for winter of 2023/2024 and will have to be completed prior to roadway construction. Preform project utility work as much as practical during the winter of 2023/2024, prior to roadway construction beginning in early 2024." 5. The following comments from the previous bid are in still in place and inform this rebid: a. Santaquin City will provide Civil3D and CAD files to the awarded Contractor. They are for the Contractor's convenience, are to be used at the Contractor's risk, and their use is subject to the J-U-B Electronic Documents/Data Limited License b. Replace Key Note 20 on the Demolition Roadway and Utility Plans (C-000 series sheets) with, "REMOVE GASE LINE AS REQUIRED (by DOMINION ENERGY)" c. Replace paragraph SC-5.06.B in the Supplementary Conditions with the following: "The existing natural gas line in Main Street owned by Dominion Energy is believed to be asbestos coated. Dominion Energy will remove any gas pipe where it conflicts with project improvements. All steel gas pipe not in conflict with project improvements is to be abandoned in place and should not be disturbed." d. Replace the paragraph in Division 1M.27.2.c with the following: "Dominion Energy will remove their existing 4" and 6" gas lines in Main Street, which are believed to be asbestos coated, where they conflict with project improvements. All steel gas pipe not in conflict with project improvements is to be abandoned in place and should not be disturbed. Santaquin City will be holding a new mandatory pre-bid meeting as indicated on the Advertisement Even if one or more of your representatives attended the original pre-bid meeting, your representative still must attend the upcoming, mandatory pre-bid meeting to be considered as a qualified bidder. Bid Results : Alternate A Landmark Excavating Inc $6,353,393 Alternate B Landmark Excavating Inc $8,052,546 Alternate C Landmark Excavating Inc $14,032,261

Bid Results

Roads / Highways

$28,438,200.00

Public - City

Paving, Site Work

307

12

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
28
Bidding Soon
478
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2023

February 5, 2024

img_map_placeholder

Multiple Locations, Santaquin, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.