BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Bloomington, Indiana. Completed plans call for the renovation of a educational facility.

All questions, or requests for equal, shall be directed in writing via email to: Bill Eisler R.E. Dimond and Associates, INC. 317-634-4672 Bill.eisler@redimond.com The work associated with this project consists of the replacement of one Air Handling Unit, and the extension of chilled water services for the addition of cooling to the project area, starting February 1, 2024, in accordance with the Plans and Specifications prepared by R.E. Dimond and Associates, Inc. 732 North Capitol Avenue, Indianapolis, IN 46204. The AHU has been pre purchased by the Owner. The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a 100% Performance Bond/Labor and Material Payment Bond in the amount equal to the contract price, and such bond shall comply with all laws of the State of Indiana governing public contracts let by governmental units. Each bid shall be accompanied by a bid security for five percent (5%) of the base bid in the form of a certified check or a bid bond. Bid bonds shall be executed by the bidder and a surety company qualified to do business in the State of Indiana. The check or bid bond shall be made payable to Monroe County Community School Corporation. Should a successful Bidder withdraw the bid, or fail to execute a satisfactory Contract, the Owner may then declare the Bid deposit forfeited as liquidated damages. The project is located at Bloomington High School South - 1965 S. Walnut Street, Bloomington, IN, 47401. B. Work includes, but not limited to, the demolition of the existing AHU, piping, controls, etc., and installation of new AHU, piping, ductwork, controls, electrical connection, etc., as show on the drawings and specified herein. C. Delivery of the AHU to the site is anticipated to occur on or about February 15, 2024. AHU shall be installed and operational with Work substantially complete by July 15, 2024. D. This project is being funded by MCCSC's Federal ESSER III Funds (Elementary and Secondary School Emergency Relief Fund). This project is subject to the Davis-Bacon Act Prevailing Wage Rate. The Contractor shall follow all necessary guidelines for compliance with ESSER and the Davis-Bacon Act.

Award

Educational

$284,000.00

Public - County

Renovation

15

12

4

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
33
Bidding Soon
892
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

February 15, 2024

img_map_placeholder

1965 S Walnut St, Bloomington, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.