BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Hitchcock, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Question Deadline 11/09/2023 at 12:00 PM CT Work of the Contract is primarily for cut, plug and abandonment of GCWA s old 30-inch waterline adjacent to the active 36-inch/30-inch waterline referred to as SH-6 Southline. The project also includes the installation of a 4-inch tap, and roadway pavement replacement. The project will be constructed within City of Hitchcock ROW, GCWA Easement, and TxDOT ROW. Your Contract is being recommended to the Gulf Coast Water Authority Board of Directors for approval Thursday, DECEMBER 14, 2023. The GCWA reserves the right to reject any bid and to waive informalities in the bids All Bids Shall Be Accompanied by a Cashier s or Certified Check Drawn on a State or Local Bank in the Amount of Five Percent (5%) of the Total Maximum Bid Price, and Payable Without Recourse to the Gulf Coast Water Authority, Texas City, Texas, or a Bid Bond in the Same Amount From a Reliable Surety Company Authorized to Do Business in the State Of Texas, as a Guarantee That the Bidder Will Enter Into a Contract. The Notice of Award of Contract Shall Be Given by the Gcwa Within Sixty (60) Days Following the Opening of Bids and Bids Shall Remain Valid for Sixty (60) Days. The successful bidder must furnish a Performance Bond and a Payment Bond in the amount of one hundred percent (100%) of the Contract Price and upon the forms which are attached hereto. A Payment Bond shall be furnished for any contract in excess of Twenty-Five Thousand Dollars ($25,000) and a Performance Bond shall be furnished for contracts in excess of One Hundred Thousand Dollars ($100,000), and each shall be furnished within five (5) days after receipt of the Contract Documents. Accordingly, instead of requiring any such proof, the Authority and the Contractor agree that as liquidated damages for delay (not as a penalty) the Contractor shall pay the Authority One Thousand Dollars ($1,000.00) for each day that expires after the time specified in Article 3.1, in this Agreement, for Substantial Completion until the Work is Substantially Complete. Estimate has changed from TBD to The Total Stipulated Price for this project is in the range of $350,000 --> $400,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$625,000.00

Public - State/Provincial

Paving, Site Work

32

20

3

6

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
52
Bidding Soon
2,596
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.