BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Framingham, Massachusetts. Conceptual plans call for the renovation of a municipal facility.

This project is included in the City of Framingham 2024-2028 Capital Improvement Program (CIP). As of October 24, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is being allotted to fiscal year 2024. A detailed scope has not yet been released. This request for capital budget funding is for the purchase and installation of an appropriately sized generator at the Farley Building. The current generator is greatly undersized for the Districts needs now that the building is occupied by central office staff. This project would allow for the installation of an appropriately sized generator that will provide coverage for the newly relocated offices. Additionally, this generator will be designed to support future operational expansion within the building, allowing for continued operations of the District`s Central Office during power outages. The requested funding amount incorporates an increase due to continued inflation and fluctuation in pricing experienced in the market. While this is an estimate, we believe the number will cover all costs associated with this project but understand the continued market fluctuation will result in volatile numbers for the foreseeable future. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$610,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
198
Bidding Soon
3,079
All Active Projects
1,279
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

img_map_placeholder

19 Flagg Dr, Framingham, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.