BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Beale AFB, California. Contact the soliciting agency for additional information.

Please send all proposals to: makenna.watkins@us.af.mil and theodore.churchreeves@us.af.mil. If you need a link for submittal, email makenna.watkins@us.af.mil to request one BEFORE day of proposal due date. The last day to submit a RFI was May 8th, 2024, at 1200 PDT. The Contractor shall furnish all design, labor, equipment, material, manufactured articles, transportation, supervision, and all other necessary items to accomplish the combinations of design, repair, or construction of airfield and general paving work under the Transportation and Paving IDIQ. See attachment 1. Specifications - CAO 28 FEB 24-TP, for additional information. Amendment 01 - Please see revised documentation regarding RFI responses, to include the pre-proposal conference, and other changes to the solicitation. Amendment 02 - The purpose of this amendment is to: - Attach RFI02 "RFI-02-Solicitation Phase-TP". - Update the name of Attachment 4 from "4. VOL 3-PAST PERFORMANCE-Last 4 Contract Number-Company" to "4. VOL 4-PAST PERFORMANCE-Last 4 Contract Number-Company". - Update Section L.3.4 from "All the following documents will be included in the electronic file "Volume 4 - Past Performance". All files will be named in this format: "V4-DOC NAME-COMPANY NAME". " to " All the following documents will be included in the electronic file "VOL 4-PAST PERFORMANCE-Last 4 Contract Number-Company". All files will be named in this format: "VOL 4-PAST PERFORMANCE-Last 4 Contract Number-Company". " The updated document is "Section L - Instructions, Conditions, and Notices to Offerors 18 Apr 24" - Major updates to 8. Cost Worksheet-04182024, please review. - Attach "Meeting Minutes 04112024-TP GC-MATOC" Reflecting the pre-proposal conference held last week. Amendment 03 - The purpose of this amendment is to: - Attach RFI03 "RFI-03-Solicitation Phase-TP". - Added the following bullet to L.3.4.: "When completeing the Self Scoring Worksheet Volume 4 "PAST PERFORMANCE FOR RELEVANT EXPERIENCE PROJECTS" Column C, use the "Quality" rating on CPARS document." - L.4.d was updated from: "The Offeror must only fill in Columns C, E, and F. Columns will be filled by utilizing a drop down list and selecting appropriate score for each element as applicable. Do not leave any elements blank. Note: The scoring elements are not minimum requirements. Column G will be filled with the applicable file name." to "The Offeror must only fill in Columns B, C, E, and F and G. Columns will be filled by utilizing a drop down list and selecting appropriate score for each element as applicable, filling with Contract number (column B) or, filled with the applicable file name (Column G). Do not leave any elements blank. Note: The scoring elements are not minimum requirements." - Correct minor spelling corrections Amendment 04 - The purpose of this amendment is to: - Add "The template for Past Performance Questionnaires is available on SAM.gov "4. VOL 4-PAST PERFORMANCE-Last 4 Contract Number-Company". Please note that the PPQ is only used in place of a CPARS in cases where a CPARS Rating is unavailable. PPQ and CPARS are the evaluation factor for past performance and will be submitted with the proposal." to L.3.4. - Add "... replace "NAICS" and insert the project's NAICS code" to L.4.d. - Add "The "Table of Contents" area is provided to organize information, list all documents and any important page numbers within those documents." to L.3.1.a. - Add If you have both a JV and teaming/partnership agreement, combine them into a single document named "V1-JVPA-COMPANY NAME", if you have only a JV, "V1-JV-COMPANY NAME", if you have only a partnership/teaming agreement, "V1-PA-COMPANY NAME", if none, "N/A" on the self-scoring working sheet file name section." to L.3.1.b. - Add "Name the file ""VOL 5-PRIME-Last 4 Contract Number-Company Name"." to L.3.5.a. - Change ""V2-DOC NAME-COMPANY NAME"" to ""V2-527-COMPANY NAME"" in L.3.2.a. - Add "Combine the two into a single pdf named "V2-JV 527-COMPANY NAME". For populated joint ventures, financial responsibility GSA Form 527 must be submitted for the joint venture itself named "V2-JV 527-COMPANY NAME"." to L.3.2.b. - Add document "REFERENCE ONLY-File Nomenclature" to Sec J. This is not updated information. It is a consolidated version of all file names by Volume. - Add "The last day to submit a RFI is May 8th at 1200 PDT." to Block 10 of solicitation. - Add "The last day to submit a RFI is May 8th at 1200 PDT." to L.2.g

Post-Bid

Roads / Highways

Public - Federal

Service, Maintenance and Supply

1

3

14

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
41
Bidding Soon
749
All Active Projects
296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2024

May 27, 2024

img_map_placeholder

Multiple Locations, Beale AFB, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.