Site work and paving for a road / highway in Pittsburgh, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Pittsburgh Office of Management & Budget, on behalf of the Department of Mobility & Infrastructure, is seeking bids from Contractors to stabilize the soil and trail above the western end of Greenleaf Street in the City of Pittsburgh. Work will include installing Deep Soil Mixing panels just above and to the East of the bottom portion of Greenleaf Street. Work will also include installing soil nails, and stabilizing the portion of Emerald View Park trail on that slope with soil nails and micropiles. Question Submission Deadline November 14, 2023, 3:00pm A Bid Bond is required Guarantees should be in the form of a surety bond, certified check, cashier's check or letter of credit in an exact dollar amount equal to five percent (5%) of the bid. For example, a total bid of $100,000.00 should have a bid guarantee in the amount of $5,000.00. Period of Contract:One-Time Project Performance Bond A performance bond in an exact dollar amount equal to the full amount (100%) of their contract will be required from each awarded vendor for any resulting contract. Payment Bond A payment bond in an exact dollar amount equal to the full amount (100%) of their contract will be required from each awarded vendor for any resulting contract. The City requires the work required under this Contract, including Project Closeout activities, to be completed within 336 calendar days from Notice to Proceed (Contract Completion Due Date). For everyday of delay in completion of Contract Work after the Contract Completion Due Date, the Contractor will be assessed daily Construction Engineering Liquidated Damages in accordance with Publication 408 Section 108.07 and that amount will be deducted from the Payments to the Contractor. Substantial or unreasonable delays in response times, estimated time, or non-adherence thereto, in addition to any failure to meet project schedule deadlines or otherwise fail to comply with the terms and conditions of the contract shall constitute cause for the assessment of liquidated damages. Such damages shall be assessed on a per project basis based on pre-scheduled uses of the project, projected lost revenues, cost of alternative space, opportunity costs, etc. Liquidated damages shall be deducted from payments due under this scope of work. The City of Pittsburgh is committed to the ideal of providing all citizens an equal opportunity to participate in City and its Authorities' contracting opportunities. It is therefore the City's goal to encourage increased participation of women and minority groups in all City contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of Minority-Owned Business Enterprises (MBE's) and Women-Owned Business Enterprises (WBE's) in work to be performed under City contracts. The levels of MBE and WBE participation will be monitored by the City of Pittsburghs Equal Opportunity Review Commission (EORC). In order to ensure that there are opportunities for historically disadvantaged minority groups and women to participate on Covered Contracts, and consistent with the City's current equal employment opportunity practice and goals, the EORC will review contracts to include an evaluation of a developer/contractors employment of minority groups and women, encourage goals of eighteen (18) percent and seven (7) percent respectively. The Contractor shall comply with the Davis-Bacon Act the Davis-Bacon Act (40 U.S.C. 276a to 276a-7) as supplemented by Department of Labor regulations (29 CFR part 5). Contractor shall not discriminate in its employment on the basis of race, color, religion, ancestry, national origin, place of birth, sex, age, disability, non-job related handicap, or sexual orientation. Contractor shall comply with the applicable provisions of the Pittsburgh Code of Ordinances, Title Six - Conduct Article V Discrimination, and any amendments thereto. Contractor also shall comply with the applicable provisions of the Americans with Disabilities Act, any amendments thereto, and any regulations issued thereunder. Contractor shall incorporate in any subcontracts which may be permitted under the terms of the contract, a requirement that said subcontractors also comply with the provisions of this section. The City reserves the right to reject, for any reason, any or all bids if it is in the best interest(s) of the City to do so.

Post-Bid

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

60

13

3

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Grilles and Screens
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Soil Nailing, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
126
Bidding Soon
1,015
All Active Projects
480
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

December 21, 2023

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Greenleaf St. Stabilization

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.