BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 13, 2023 at 7:00 PM

Updated February 10, 2024

This is a service / maintenance or supply contract in Salt Lake City, Utah. Contact the soliciting agency for additional information.

UTA seeks to engage a Contractor to provide a broad variety of transit design, construction, maintenance, and repair services on an as- needed basis. UTA wants to engage a contractor to perform Transit Infrastructure design, construction, maintenance, and repair work on UTAs transit system beyond UTA personnels ability to perform. The work will be on an on-call basis during the term of the contract, but the volume of work is large enough to require two full-time contractor personnel (an Infrastructure Project Manager, and Infrastructure Superintendent) to manage the work. It is anticipated that the project manager and superintendent will be required to maintain an on-site presence and will share office space with UTAs staff at a UTA office building. Contractor will also be required to have the ability to contract with qualified design firm to supply UTA with Design needs as requested. A Bid Bond (or equivalent guaranty in the form of a letter of credit, certified check or other negotiable instrument deemed to be equivalent by the Authority) equal to five percent of the proposed Contract price securing performance in accordance with the Bid or Proposal provided with submission of bid or proposal. A Performance Bond equal to 100% of the Contract price provided prior to formal contract execution. A Payment Bond equal to 100% of the Contract price provided prior to formal contract. DBE goals will be determined on a per Task Order basis when federal funds are utilized. The goals list below are reflective of the goals that will be issued for individual task orders based on the type of work performed. These goals are provided to aid Proposers in their work planning and cost calculations used in assembling their Proposals. If there is an inconsistency in the goals listed below and the goals issued in an individual task order, the latter will take precedence. SGR401 Ballast & Ties DBE Goal is Race Neutral. SGR393 Grade Crossing DBE Goal is 2%. SGR385 Rail Replacement DBE Goal is 3%. This will be a Task Order Contract. These rates and prices will be used to negotiate a Lump Sum Price or Time and Material Cost for each Task. Deadline to submit Questions and Request for Approved Equals or Changes to UTA : December 22, 2023, 2:00 pm MST

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
88
Bidding Soon
971
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

March 18, 2024

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.