BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Box Elder, South Dakota. Working plans call for the renovation of a military facility; for site work for a sidewalk / parking lot; for the addition of a military facility; and for the demolition of a military facility.

PLA for W9128F24SM008 The Corps of Engineers Omaha District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for large scale construction projects (exceeding $35 million) within the Ellsworth Air Force Base (EAFB), South Dakota area. Provide your responses NLT 2PM, Central Standard Time, 21 December 2023 to gloria.garside@usace.army.mil and courtesy e-mail shawn.a.adkins@usace.army.mil. Ensure your response is limited to 5 pages and the Subject Line of your response includes "PLA Survey - B-21 ADAL Ops AMU1, Ellsworth Air Force Base (EAFB), South Dakota". Please provide your contact information in the body of the email. A PLA is defined as a pre-hire collective bargaining agreement between a Prime contractor and one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S. C. 158(f). Federal Acquisition Regulation (FAR 22.503) Policy provides that: a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. b) An agency may, if appropriate, require that every contractor and subcontractor, or certain subcontractors, engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will. i. Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards and other matters; and ii. Be consistent with law. Reference: FAR 52.222-33 Notice of Requirement for Project Labor Agreement; FAR 52.222-34 Project Labor Agreement. Request responses to the following questions: (1) Do you have knowledge that a PLA has been used in the local area on projects of this kind If so, please provide supporting documentation. (2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the reference project If so, please elaborate and provide supporting documentation where possible. (3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed If so, please elaborate and provide supporting documentation where possible. (4) Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. (5) Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. (6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project. (7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. The information gathered in this survey should include the following information on projects completed in the last 2 - 5 years: 1. Project Name and Location 2. Detailed Project Description 3. Initial Cost Estimate vs. Actual Final Cost 4. Was the project completed on time 5. Number of craft trades present on the project 6. Was a PLA used 7. Were there any challenges experienced during the project Project Description: This is a fully Designed design-bid-build (DBB) Project. Renovate existing building 7274 and construct an addition to building 7274 to support the transition of the facility from a B-1 Squadron Operations/ Aircraft Maintenance Unit facility to a B-21 Squadron Operations/ Aircraft Maintenance Unit facility. Construction includes reinforced concrete foundations and concrete floor slab, structural steel frame with split faced concrete masonry unit facade and a standing seam metal roof to match the current facilities. Project includes communication and fire protection requirements, heating, ventilation, and air conditioning systems, and all other necessary support for a complete a usable facility. The existing road and parking lot on the proposed site will be removed and replaced as needed to provide space for proper siting of the building and new parking. This project also includes all utilities, site improvements, pavements, detection/protection features, security enhancements, and other supporting work necessary to make a complete and usable facility. The project may include bid options for furniture, furnishing and equipment (FF&E), user-funded equipment, intrusion detection systems (IDS), access control systems (ACS), temporary Government field office facilities, and closed-circuit television (CCTV) systems. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special construction and functional requirements include demolition of existing facilities and infrastructure - to include hazardous materials and soils may be required. The facility contains multiple secure spaces to be designed and constructed. Special oversight of this project may also be required. Disclosure of the magnitude of construction, as prescribed in FAR 36.204 and DFARS 236.204, is between $25M and $100M. Contractors responding to this market survey must submit their responses via e-mail to Nancy Garside at gloria.garside@usace.army.mil no later than 2:00 PM CST, 21 December 2023.

Final Planning

Military

$100,000,000.00

Public - Federal

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
69
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

img_map_placeholder

336 Main Gate Rd, Box Elder, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.