BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2024 at 7:00 PM

Updated July 3, 2025

Site work and paving for a transportation facility in Minden, Nevada. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

As of January 12, 2024 the project has been awarded, however, a timeline for construction has not been confirmed. Minden-Tahoe Airport Any questions regarding this project are to be directed to the office of Armstrong Consultants, Inc., Reno, Nevada, (775) 346-3010 for interpretation Est. Value Notes: Probable Cost: $600,00 Questions should be emailed to Nadine Burgard at nburgard@armstrongconsultants.com. Schedule I - Rehabilitate Southwest Taxilanes (6,189 sy) Schedule II - Rehabilitate Southeast Taxilanes (8,254 sy) Schedule III - Rehabilitate Apron Area (562 Sy) 40-01 INTENT OF CONTRACT. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 ALTERATION OF WORK AND QUANTITIES. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner's Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work. For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities. Should the value of altered work or quantity variance meet the criteria for significant change in character of work, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental agreementsshall also require consent of the Contractor'ssurety and separate performance and payment bonds. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion

Award

Transportation Terminals

$743,007.00

Public - County

Paving, Site Work

17

13

4

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
34
Bidding Soon
405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

December 18, 2023

Project location map

1146 Airport Rd, Minden, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.